-
The dedicated right-turn lane, along NW South River Dr, to access the southbound SR 826/Palmetto Expressway on-ramp has been removed. Motorists will still be able to make right turn to access the on-ramp from the remaining travel lane. This removal will allow the crew to perform bridge demolition and widening.
-
One northbound thru lane and one right-turn lane on NW South River Drive at the northbound S.R. 826/Palmetto Expressway off-ramp have been removed.
Lanes are reduced to one lane in each direction for approximately eight months while bridge reconstruction work is completed.