Welcome
The Florida Department of Transportation (FDOT) began a roadway project on June 2, 2025, along State Road (SR) 826/Frontage Road/NW 77 Court from NW 154 Street to NW 164 Street, in Miami-Dade County.
FDOT COMPASS
COMMUNITY
- Constructing a shared-use path along NW 77 Court adjacent to the Peter Pike Canal
SAFETY
- Enhancing lighting and installing new school zone beacons, speed feedback signs, and rectangular rapid flashing beacon crosswalk within the project limits
RESILIENCY
- Upgrading the stormwater drainage system to improve capacity
- Repaving and restriping to preserve the service life of the road
SUPPLY CHAIN
- Replacing and upgrading pedestrian curb ramps and guardrail
TECHNOLOGY
- Installing speed feedback signs
WORKFORCE DEVELOPMENT
- This project creates opportunities for contractors, which results in positive economic benefits for the wokers and the community
LANE CLOSURE INFORMATION
Single lane closures shall occur only during non-peak hours or non-event days/weekends. Non-peak hours are:
- 9 a.m. to 3:30 p.m., on non-school days
- 8 p.m. to 6 a.m., all other days
Project At-A-Glance
Start Date |
---|
June 2025 |
Est. Completion |
Spring 2026 |
Construction Cost |
$3.4 million |
Lengths and Limits |
From NW 154 Street to NW 164 Street |
FDOT North Miami-Dade Resident Engineer |
Ivan Hay, P.E. |
FDOT North Miami Dade Assistant Resident Engineer |
John M. Garzia, P.E. |
FDOT Project Manager |
Colin W. Johnson, P.E. |
Project Administrator |
Nicholas Arango, EI |
Contractor |
Horizon Contractor, Inc. |
Community Outreach Specialist |
Aliyah Gomez Holt Communications, Inc. O: (786) 837-4884 C: (786) 774-9714 |