The Florida Department of Transportation (FDOT) has begun an intersection improvement project at SR 852/NW 215 Street and SR 7/NW 2 Avenue, in Miami-Dade County.
WORK TO BE PERFORMED
- Widening to add a second right turn lane along eastbound NW 215 St
- Replacing the traffic signal at the southeast corner of the intersection
- Installing new stormwater drainage structure at the southwest corner of the intersection
- Reconstructing sidewalks and curb and gutter within project limits
- Installing pedestrian curb ramps, high emphasis crosswalks and detectable warning surfaces
- Installing signage and pavement markings
- Repaving and restriping the roadway
LANE CLOSURE INFORMATION
Travel lanes may be closed only during nonpeak hours on nonevent days. Nonpeak hours are:
- 9 a.m. to 3:30 p.m., Weekdays and Weekends
- 9 p.m. to 5:30 a.m., Sunday through Thursday nights
- 11 p.m. to 7 a.m., Friday and Saturday nights
No work can occur between 8 p.m. to 8 a.m. except for stormwater drainage work and repaving and restriping the roadway. Lane closures shall occur from:
- 9 p.m. to 5:30 a.m. Sunday through Thursday Nights
- 11 p.m. to 7 a.m. Friday and Saturday nights
Project At-A-Glance
Start Date |
---|
October 2023 |
Est. Completion |
Early 2024 |
Construction Cost |
$640,000 |
Lengths and Limits |
SR 852/NW 215 Street and SR 7/NW 2 Avenue |
FDOT North Miami-Dade Resident Engineer |
Ivan Hay, P.E. |
FDOT Project Manager |
Colin W. Johnson, P.E. |
FDOT Project Administrator |
Damelis Puentes, P.E. |
Contractor |
Florida Engineering & Development Corp |
Community Outreach Specialist |
Jeff Baquedano
C: (786) 510-6113 |