The Florida Department of Transportation (FDOT) has begun a ramp improvement project along State Road (SR) 9A/I-95 Expressway in Miami-Dade County.
This project is incorporated as one of three distinct construction projects scheduled for early 2024, all taking place simultaneously within the same regions. The additional projects include the SR 913/Rickenbacker Causeway Flyover Bridge Rehabilitation Project, which construction activities are currently underway, and the SR 913/SW and SE 26 Road Roadway project which is estimated to commence in April 2024.
WORK TO BE PERFORMED
- Widening the roadway from I-95 SB off-ramp to SW 26 Rd
- Installing a new traffic signal at SW 25 Rd
- Installing wrong-way countermeasures, rapid flashing beacons and traffic video detection equipment on traffic signals
- Replacing pavement at ramp entrances, exits and bridge approaches
- Modifying drainage structures and replacing damaged sidewalks and curb and gutter
- Upgrading signals, lighting, signage and pavement markings
- Repaving and restriping the roadway
LANE CLOSURE INFORMATION
- 9 p.m. to 6 a.m. Sunday through Thursday Nights
- 11 p.m. to 7 a.m. Friday and Saturday Night
- 9 a.m. to 3:30 p.m. Weekdays and Weekends
- 11 p.m. through 5 a.m. Friday through Monday
Below are the graphic maps depicting the various locations for the proposed construction improvements
SR 9A/I-95 Ramps at Rickenbacker Causeway and SW 25 Road
SR 9A/I-95 Ramps at SW 8 Street and SW 7 Street
SR 9A/I-95 Expressway Shoulders from SR 5/US 1/S Dixie Highway to SW 8 Street
Combined Project Area Map
You may find additional information about the various projects underway by visiting the FDOT project webpages below:
Start Date |
---|
February 2024 |
Est. Completion |
Spring 2025 |
Construction Cost |
$12.3 million |
Lengths and Limits |
SR 9A/I-95 Ramps from the Rickenbacker Causeway to SW 25 Road, from SR 90/SW 8 Street to SW 7 Street, from SR 90/SW 8 Street to S Dixie Highway and from SR 970/SR 5/Downtown Distributor Ramps from South Miami Avenue to SE 2 Avenue and along SR 9A/I-95 |
FDOT South Miami-Dade & Monroe Counties Resident Engineer |
Dru Badri, P.E. |
FDOT Construction Project Manager |
Francisco Lledo, E.I. |
FDOT Project Administrator |
Milad Mansouri |
Contractor |
OHLA USA Inc. |
Community Outreach Specialist |
Jeff Baquedano Quest Corporation of America
C: (786) 510-6113 |