State Road (SR) 25/US 27/Okeechobee Road Corridor Wide Updates:

Below is a list of ongoing construction activities and lane closure information for each project segment.

Real time traffic alerts and incident reports will included as necessary to keep the traveling public informed. 

 

To download a copy of this week's email blast or to view previous ones, click here.

 

 

ONGOING CONSTRUCTION ACTIVITIES

 

 

SEGMENT TWO: 423251-5 From east of NW 107 Ave to east of NW 116 Way/Hialeah Gardens Blvd

 
  • Performing roadway widening and drainage installation work along Okeechobee Rd, NW 116 Way/Hialeah Gardens Blvd, NW S River Dr, NW 121 Way and Frontage Rd
  • Installing the following:
    • Sewer pipes for the new pump station on NW 121 Way
    • Bridge walls
    • traffic railing and signs along along Hialeah Gardens Blvd
    • Signs along Frontage Rd
    • Concrete pavement along Okeechobee Rd
    • Light poles along NW South River Dr
  • Pile driving operations and bridge construction at:
    • Hialeah Gardens Blvd just north of Frontage Road
    • Okeechobee Rd and NW 98 Ave
    • Okeechobee Rd and NW 114 St
    • Okeechobee Rd at the NW 116 Way intersection
    • NW 121 Way Bridge

 

 

General Lane Closures
 
  • A single lane closure along NW 116 Way from Frontage Rd to W 68 St, in both the northbound and southbound direction
  • A single lane closure along Okeechobee Rd from NW 92 Ave to NW 107 Ave, in both the northbound and southbound direction
 
Closures will take place Monday through Saturday during the following hours:
 
  • 9 p.m. to 5:30 a.m. on weekdays
  • 11 p.m. to 7:30 a.m. on weekends

 

Continuous Lane Closures/Traffic Shifts

  • Travel lanes are reduced to two lanes in each direction along the NW 116 Way bridge between Okeechobee Road and NW South River Drive. 
  • Traffic lanes are reduced to two lanes in each direction along Okeechobee Rd from east of NW 107 Avenue to NW 92 Ave. 

 

PLEASE NOTE THAT SCHEDULES MAY CHANGE DUE TO WEATHER OR UNEXPECTED CONDITIONS.

 

 

 

 

NW 121 WAY BRIDGE RECONSTRUCTION

 

 

The NW 121 Way bridge is fully closed for approximately one year. The contractor will demolish parts of the existing bridge, while maintaining some foundation piles. Crews will rebuild, widen, and pour a new concrete deck. With plans to reopen a fully operational bridge by late 2024. 

 

Alternative routes are in place along NW South River Drive to provide motorists access to and from SR 25/US 27/Okeechobee Road.

 

 

 

 

CURRENT TRAFFIC PATTERNS AND LANE CLOSURES

 

 

Plan your commute! Click HERE to view the corridor wide traffic patterns and lane closures.