PROJECT SUMMARY:
The Florida Department of Transportation (FDOT) is developing the design for an intersection project located along State Road (SR)989/Sunset Drive/SW 72 street at SR 826/Palmetto Expressway southbound off-ramp
WORK TO BE PERFORMED:
-
Upgrading existing pedestrian and traffic signalization
-
Replacing pavement markings
-
Repaving and restriping the road
MAINTENANCE OF TRAFFIC
During construction, temporary lane closures might affect traffic. Pedestrian detours will be established with clear signage. Access to adjacent businesses and neighborhoods will be maintained.
Project At-A-Glance
| Construction Start Date |
|---|
| March 2026 |
Construction Cost |
| $599,399 |
Lengths and Limits |
| State Road (SR) 989/SW 72 Street/Sunset Drive at SR 826/Palmetto Expressway southbound off-ramp |
FDOT Project Manager |
| Jessica Cruz P.E. |
Consultant project Engineer |
| Carlos H. Perez P.E. CHP Engineers and Surveyors |
Community Outreach Specialist |
| Jose Luis Fernandez Infinite Source Communications Group O: 305-470-5477 |