The Florida Department of Transportation (FDOT) is developing the design for a roadway project along State Road (SR) 972/Coral Way/SW 22 Street from SW 22 Avenue to SW 17 Avenue, in Miami-Dade County.
WORK TO BE PERFORMED:
- Removing an abandoned driveway
- Repairing damaged driveways
- Repaving and restriping the road
- Replacing Rectangular Rapid Flashing Beacons (RRFB) at the midblock crosswalk near SW 21 Avenue
- Replacing damaged stormwater drainage
- Reconstructing damaged sidewalks and upgrading pedestrian curb ramps
- Trimming landscape located in the median to improve intersection sight distance
- Upgrading lighting at the midblock crosswalk near SW 21 Avenue
MAINTENANCE OF TRAFFIC
During construction, there will be temporary lane closures during non-peak hours and detours will have effects on traffic. Pedestrian detours will be established with clear signage. Access to adjacent businesses and neighborhoods will be maintained.
Construction Start Date |
---|
February 2025 |
Construction Cost |
$2 million |
Lengths and Limits |
SR 972/Coral Way/SW 22 Street from east of SW 22 Avenue to west of SW 17 Avenue |
FDOT Project Manager |
Paola Martinez, P.E. |
FDOT Consultant Project Manager |
Rodney Devera, P.E. Connect Engineering |
Community Outreach Specialist |
Rodolfo Roman Infinite Source Communications C:786-519-7160 O: 305-470-5477 |