Project Summary
 
The Florida Department of Transportation (FDOT) is developing the design for an intersection project located at State Road (SR) 94/SW 88 Street/Kendall Drive at SW 157 Avenue, in Miami-Dade County. 
 
WORK TO BE PERFORMED:
  • Providing additional traffic signals
  • Upgrading curb ramps and sidewalks
  • Upgrading existing pedestrian signalization
  • Repaving and restriping the road 
 
MAINTENANCE OF TRAFFIC
During construction, temporary lane closures will have effects on traffic. Pedestrian detours will be established with clear signage. Access to adjacent businesses and neighborhoods will be maintained.

Project At-A-Glance
 
map
Construction Start Date
August 2025

Construction Cost
$$733,484

Lengths and Limits
SR 94/SW 88 Street/Kendall Drive at SW 157 Avenue

FDOT Project Manager
Jose Barrera, P.E.


FDOT Consultant Project Engineer
Carlos H Perez, P.E