Welcome
 

The Florida Department of Transportation (FDOT) is developing the design for a roadway project along SR 860/Miami Gardens Drive/NW 186/183 Street from State Road (SR) 93/I-75 to NW 79 Place, in Miami-Dade County.  
 
WORK TO BE PERFORMED: 
  • Adding one travel lane in each direction and a shared-use path on the north side of Miami Gardens Drive
  • Closing a median west of NW 87 Avenue
  • Opening a median between NW 82 Avenue and NW 84 Place
  • Repaving and restriping the roadway
  • Modifiying storm water drainage, manholes, and curb ramps
  • Upgrading street lights, sidewalks, pedestrian signs and pavement markings
  • Adding new vehicular and pedestrian signals at NW 87 Avenue and NW 82 Avenue.
MAINTENANCE OF TRAFFIC: 
During construction, temporary lane closures during non-peak hours and detours may affect traffic. Pedestrian detours will be established with clear signage. Access to adjacent businesses and residences will be maintained.
 
PUBLIC MEETING:
 
FDOT hosted an in-person and online Public meeting on December 2,  2024 at the Country Club of Miami.
 
Click the link to learn more about this project and watch the meeting recording: 
 
  

Project At-A-Glance
 
map
Construction Start Date
August 2029

Construction Cost
$26 million

Lengths and Limits
SR 860/Miami Gardens Drive/NW 186 Street from SR 93/I-75 to NW 79 Place

FDOT Project Engineer
Alejandro Quintela P.E.


FDOT Environment and Noise Specialist
Sebastian Ruiz


FDOT Project Manager
Kevin A. Lopez P.E.


Community Outreach Specialist
Jose Luis Fernandez

Infinite Source Communications Group

O: 305-470-5477

Josel.Fernandez@dot.state.fl.us