Welcome
The Florida Department of Transportation (FDOT) is developing the design for a bridge rehabilitation project along State Road (SR) 970/Downtown Distributor from SR 5/US 1 to SR 9A/I-95 northbound bridge, in Miami-Dade County.
WORK TO BE PERFORMED:
- Rehabilitating and painting the bridge.
MAINTENANCE OF TRAFFIC
During construction, temporary lane closures and detours will have effects on traffic. Detours will be established with clear signage. Work will be done in stages to minimize impacts and ensure that traffic continues to flow safely through the work zone.
Project At-A-Glance
Construction Start Date |
---|
July 2025 |
Construction Cost |
$2.1 million |
Lengths and Limits |
SR 970/Downtown Distributor from SR 5/US 1 to SR 9A/I-95 northbound bridge |
FDOT Project Manager |
Audria Duncan |
Consultant Project Engineer |
David A. Rojas Colliers Engineering and Design |
Community Outreach Specialist |
Jose Ignacio Grados Infinite Source Communications Group O: 786-537-3363 JoseI.Grados@dot.state.fl.us |