Welcome
The Florida Department of Transportation (FDOT) has begun a roadway project along SR 5/US 1/South Dixie Highway in Miami-Dade County.
FDOT COMPASS
FDOT is committed to ensuring the State’s infrastructure serves residents, businesses, and visitors to meet their current and future transportation needs. Benefits of this project include:
COMMUNITIES
-
Reconstructing concrete sidewalks and driveways
SAFETY
-
Installing detectable warning surfaces and upgrading pedestrian signalization
-
Replacing traffic guardrails
RESILIENCY
-
Improving stormwater drainage on the north side of SW 98 Street and the south side of SW 90 Street
SUPPLY CHAIN
- Repaving and restriping the roadway
TECHNOLOGY
-
Installing traffic detection equipment onto existing traffic signals
-
Upgrading existing light poles with light-emiting diodes (LED) at various locations
WORKFORCE DEVELOPMENT
- This project creates opportunities for contractors resulting in positive economic benefits for workers and the community
LANE CLOSURE INFORMATION
Work will be done in phases to reduce the effects of construction on the community. Lanes can be closed during the following hours:
- 9 a.m. to 3:30 a.m., weekdays and weekends
- 9 p.m. to 6 a.m., Sunday through Thursday nights
- 11 p.m. to 7 a.m., Friday and Saturday nights
Access to businesses and residences will be maintained. Lane closure information is posted weekly on the department's website, www.southflroads.com.
DETOUR INFORMATION
Pedestrian and vehicular detours will be established at times and may exceed past the non-peak lane closures hours. Specific detour information will be provided before the corresponding construction activity is scheduled.
ALWAYS PUT SAFETY FIRST
For your safety and the safety of others, please use caution when driving, walking or biking around any construction zone. For real-time traffic information, visit: www.FL511.com.
Project At-A-Glance
| Start Date |
|---|
| April 2025 |
Est. Completion |
| Fall 2025 |
Construction Cost |
| $3.38 million |
Lengths and Limits |
| From SW 100 Street to SW 88 Street |
FDOT South Miami-Dade & Monroe Counties Resident Engineer |
| Dru Badri, P.E. |
FDOT Project Manager |
| Carmen E. Negron, P.E. |
FDOT Project Administrator |
| David Namen, E.I. |
Contractor |
| General Asphalt Company, LLC |
Community Outreach Specialist |
| Annabella Vizcaino Quest Corporation of America C: (786) 510-6113 |