The Florida Department of Transportation (FDOT) is scheduled to begin a roadway project on October 13, 2025 along State Road (SR) 5/US 1/Biscayne Boulevard from NE 61 Street to NE 6 Avenue, in Miami-Dade County.
FDOT COMPASS
COMMUNITY
- Reconstructing damaged sidewalks at signalized intersections
SAFETY
- Installing high-emphasis crosswalks and detectable warning surfaces
RESILIENCY
- Adjusting existing manholes within the project limits to align with the final roadway surface
SUPPLY CHAIN
- Repaving and restriping to preserve the service life of the road
- Upgrading vehicular and pedestrian signals, signgage, and pavement markings
TECHNOLOGY
- Installing missing pedestrian signal countdown timers within the project limits
WORKFORCE DEVELOPMENT
- This project creates opportunities for contractors, which results in positive economic benefits for the wokers and the community
LANE CLOSURE INFORMATION
Travel lanes and sidewalks shall only be closed during non-peak hours on non-event days. Non-peak hours are:
- SR 5/US 1/Biscayne Boulevard from NE 61 Street to NE 64 Street:
- 11:30 p.m. to 7:30 a.m., weekends and weekdays
- SR 5/US 1/Biscayne Boulevard from NE 64 Street to NE 6 Avenue
- 9 p.m. to 7 a.m., weekends and weekdays
Project At-A-Glance
Start Date |
---|
October 2025 |
Est. Completion |
Summer 2026 |
Construction Cost |
$6 million |
Lengths and Limits |
From NE 61 Street to NE 6 Avenue |
FDOT North Miami-Dade Resident Engineer |
Ivan Hay, P.E. |
FDOT North Miami-Dade Assistant Resident Engineer |
John M. Garzia, P.E. |
FDOT Construction Project Manager |
John M. Garzia, P.E. |
FDOT Construction Project Administrator |
Franche Perdomo |
Contractor |
GENERAL ASPHALT COMPANY, LLC. |
Community Outreach Specialist |
Aliyah Gomez O: (786) 837-4884 C: (786) 774-9714 |