Welcome
The Florida Department of Transportation (FDOT) has completed a roadway improvement project along SR 5/Whitehead Street from Fleming Street to Truman Avenue.
PROJECT ACTIVITIES INCLUDE:
- Replacing damaged sidewalks
- Repaving and pavement reconstruction
- Upgrading pedestrian signals, detectors, and ramps
- Upgrading existing lighting to Light Emitting Diode (LED)
- Upgrading signage along the corridor
- Restriping the roadway
LANE CLOSURE INFORMATION:
- Work will take place between 8 a.m. and 8 p.m., Monday through Friday
- Pedestrian and vehicular detours will be clearly marked
- Any required lane closures will occur on non-event days and during non-peak hours
- Non-peak hours are 9 a.m. to 4 p.m., Monday through Friday
ALWAYS PUT SAFETY FIRST:
For your safety, and the safety of others, please use caution when driving, walking, or biking around any construction zone.
Project At-A-Glance
Start Date |
---|
January 2023 |
Est. Completion |
Spring 2025 |
Construction Cost |
$2.6 million |
Lengths and Limits |
Fleming St to W of Truman Ave |
FDOT South Dade & Monroe Counties Resident Engineer |
Dru Badri, P.E. |
Construction Consulting Engineering and Inspection (CCEI) Project Manager |
Tony Sabbag, C.G.C., C.C.M. |
Construction Consulting Engineering and Inspection (CCEI) Senior Project Engineer |
Hector Rodriguez, M.S., P.E. H. Rodriguez Consulting Engineering, Inc. |
Contractor |
General Asphalt Company, LLC |
Community Outreach Specialist |
Julie Brown EXP US Services 305-923-1479 |