The Florida Department of Transportation (FDOT) began a roadway project the week of November 2, 2023 along State Road (SR) 5/Overseas Highway from Mile Marker (MM) 97.0 to MM 100.0 in Monroe County.
WORK TO BE PERFORMED
- Repaving and restriping the roadway
- Widening and repaving of shoulders
- Side street reconstruction at Ocean Drive and Second Avenue
- Replacing guardrail
- Upgrading roadway signage and pavement markings
- Miscellaneous drainage improvements
- Landscaping
LANE CLOSURE INFORMATION
Travel lanes and sidewalks will be closed during non-peak hours on non-event days. Non-peak hours are:
- 9 a.m. to 4 p.m., Monday through Friday
For up to date lane closure information, please select the "lane closures" link located on the left of this page.
Start Date |
---|
November 2023 |
Est. Completion |
Fall 2024 |
Construction Cost |
$8.4 million |
Lengths and Limits |
From MM 97.0 to MM 100.0 |
FDOT South Miami-Dade & Monroe Counties Resident Engineer |
Dru Badri, P.E. |
Construction Consulting Engineering and Inspection (CCEI) Project Manager |
Anthony Sabbag HDR, Inc. |
Construction Consulting Engineering and Inspection (CCEI) Senior Project Engineer |
Hector Rodriguez, M.S., P.E. H.Rodriguez Consulting Engineering Inc. |
Contractor |
Ryan Southern Inc |
Community Outreach Specialist |
Paulette Summers Media Relations Group, LLC
O: (305) 254-8598