The Florida Department of Transportation (FDOT) began a roadway project the week of November 2, 2023 along State Road (SR) 5/Overseas Highway from Mile Marker (MM) 97.0 to MM 100.0 in Monroe County.
WORK TO BE PERFORMED
- Repaving and restriping the roadway
- Widening and repaving of shoulders
- Side street reconstruction at Ocean Drive and Second Avenue
- Replacing guardrail
- Modifying some driveways
- Upgrading roadway signage and pavement markings
- Miscellaneous drainage improvements
- Landscape improvements
LANE CLOSURE INFORMATION
Travel lanes and sidewalks will be closed during non-peak hours on non-event days. Non-peak hours are:
- 8:15 a.m. to 3 p.m., weekdays
- 8 p.m. to 6 a.m., Sunday through Thursday nights
Start Date |
---|
November 2023 |
Est. Completion |
Early 2025 |
Construction Cost |
$7.8 million |
Lengths and Limits |
From MM 97.0 to MM 100.0 |
FDOT South Miami-Dade & Monroe Counties Resident Engineer |
Dru Badri, P.E. |
Construction Consulting Engineering and Inspection (CCEI) Project Manager |
Tony Sabbag, C.G.C., C.C.M. |
Construction Consulting Engineering and Inspection (CCEI) Senior Project Engineer |
Hector Rodriguez, M.S., P.E. H.Rodriguez Consulting Engineering Inc. |
Contractor |
Ryan Southern Inc |
Community Outreach Specialist |
Paulette Summers
C: (786) 510-3921
|