S.R. 953/Le Jeune Road/SW 42 Avenue from n of Altara Avenue to s of SW 8 Street
447829-1-52-01
About
The Florida Department of Transportation (FDOT) is developing the design for a roadway project along State Road (S.R.) 953/Le Jeune Road/SW 42 Avenue from SW 40 Street to SW 8 Street, in Miami-Dade County.
WORK TO BE PERFORMED:
The project consists of roadway resurfacing, ADA improvements, and safety enhancements along S.R. 953 (LeJeune Road) from north of Altara Avenue to south of SW 8 Street. The goal is to preserve infrastructure, enhance safety, and improve accessibility.
- Constructing new raised medians at various locations for safety improvements
- Widening the outside lane along LeJeune Road from SW 9 Street to SW 8 Street to provide an additional through lane in the northbound direction
- Reconstructing curb ramps and upgrading detectable warning surface
- Installing high-visibility crosswalks at signalized intersections.
- Upgrading pedestrian signalization
- Constructing a new signalized intersection at SW 16 Street
- Installing new lighting for the proposed crosswalk on the south leg of Sevilla Avenue and the new signalized intersection at SW 16 Street
- Reconstructing drainage inlets to address widening between SW 9 Street and SW 8 Street
- Milling and resurfacing the roadway
- Upgrading roadway signage and pavement markings
MAINTENANCE OF TRAFFIC:
Work will be done in phases to reduce the effects of construction on the community. Lanes can be closed during the following hours:'
Monday night through Friday night 10:30 p.m. – 6:30 a.m.
Access to businesses and residences will be maintained at all times. Pedestrian and vehicular detours will be established with clear signage
Current Status / Upcoming Activities
In Progress