S.R. 934/71 Street from Bay Drive East to S.R. A1A/Collins Avenue
443926-1-52
×
About
PROJECT WORK SCOPE
FDOT is committed to ensuring the State’s infrastructure serves residents, businesses, and visitors to meet their current and future transportation needs. Benefits of this project include:
- Upgrading existing crosswalks with high-emphasis pavement markings at all intersections between Bay Drive East and Harding Avenue
- Upgrading vehicular and pedestrian signals, signs, and pavement markings
- Installing pedestrian curb ramps and new detectable warning surfaces
- Repaving and restriping to preserve the surface life of the road
- Installing a new video detection system
- Upgrading pedestrian signals for ADA compliance
LANE CLOSURE INFORMATION
These construction hours and do not represent continuous lane closures. Travel lanes and sidewalks will be closed during non-peak hours on non-event days. Non-peak hours are:
Single Lane Closures
- Eastbound: 6 p.m. to 7 a.m., Sunday through Thursday, each night
- Eastbound: 7 p.m. to 8 a.m., Friday and Saturday nights
- Westbound: 9:30 p.m. to 7:30 a.m., Sunday to Friday, each night
- Westbound: 10 p.m. to 8 a.m., Friday to Sunday, each night
- 9 a.m. to 3:30 p.m., weekdays and weekends
Double Lane Closures:
- Eastbound: 11 p.m. to 7 a.m., Sunday to Friday, each night
- Eastbound: 12 a.m. to 8 a.m., Friday to Sunday, each night
Side Streets Single Lane Closures:
- 9 a.m. to 3:30 p.m., weekdays and weekends
- 9 p.m. to 6 a.m., weekdays and weekends