EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

About
Project Summary
The Florida Department of Transportation (FDOT) is developing the design for a roadway project located along State Road (SR) 886/Port Boulevard from SR 5/US 1/Biscayne Boulevard to Port of Miami in Downtown Miami.
 
WORK TO BE PERFORMED:
  • Converting the inside through/left lane to a left-turn only lane at NE 5 street
  • Converting the middle through lane to a through/left-turn lane at NE 5 street
  • Upgrading railing, signalization, curb ramps and sidewalk
  • Repaving and restriping the road
MAINTENANCE OF TRAFFIC
During construction, temporary lane closures and detours will have effects on traffic. Pedestrian and vehicular detours will be established with clear signage. Access to adjacent businesses and neighborhoods will be maintained. 
Current Status / Upcoming Activities

In Progress