S.R. 997/Krome Avenue South Design Projects (from SW 296 Street to SW 136 Street)
427369-1, 427369-2, 427369-3
This project has been completed and is only available for historical reference.
About
Project Characteristics
The projects extend along Krome Avenue from SW 296 Street to SW 136 Street for a distance of approximately 10 miles. The corridor is a major north-south rural/suburban principal arterial within the project limits, with various land uses including agricultural, commercial, residential, and protected lands. The projects will address roadway safety, corridor capacity, and a variety of design deficiencies.
Overall Improvements
- Reconstruct and widen from 2- to 4-lane divided roadway
- Provide drainage system along project corridor
- Install guardrail in median throughout project length
- Provide lighting throughout project length
- Provide adequate access management along project corridor
- Enhance traffic flow along project corridor
- Provide a shared use path for pedestrians and bicyclists
- Provide new traffic signal at the intersection of SW 272 St
- Upgrade traffic signals at SW 296 St, SW 288 St, SW 264 St, SW 248 St, SW 232 St, SW 216 St, and SW 200 St
- Replace C-103 Canal/Mowry bridge
- Replace C-102 Canal culvert with new bridge
- Relocate existing South Florida Water Management District drainage control structure S-194 over C-102 canal
Current Status / Upcoming Activities
In Progress