SR 25/US 27/Okeechobee Rd from E of NW 107 Ave to E of NW 116 Way/Hialeah Gardens Blvd
423251-5-52-01
About
THIS PROJECT WAS COMPLETED JANUARY 16, 2026
The Florida Department of Transportation (FDOT) began the second of five segment projects along SR 25/US 27/Okeechobee Road the week of May 2, 2022, in Miami-Dade County.
WORK TO BE PERFORMED:
- Constructing a new second level overpass, including four new bridges, on SR 25/US 27/Okeechobee Road to cross NW 116 Way/Hialeah Gardens Boulevard
- Providing new access ramps to Frontage Road and Hialeah Gardens High School
- Widening the roadway, Frontage Road, NW South River Drive and the bridges over the Miami Canal
- Reconstructing SR 25/US 27/Okeechobee Road with concrete pavement
- Reconstructing the NW 116 Way and NW 121 Way bridges
- Installing new traffic signals at the following intersections:
- Hialeah Gardens Boulevard and NW 11600 Block
- SR 25/US 27/Okeechobee Road and NW 116 Way (overpass)
- Frontage Road and NW 122 Street
- Frontage Road and NW 98 Avenue
- Frontage Road and NW 11500 Block
- Adding new bicycle lanes and sidewalks along Frontage Road
- Installing new guardrail, medians and shoulder concrete barrier walls along the roadway
- Installing a new sewer lift station at NW 121 Way and a new flow meter at NW 116 Way
- Installing a new 102-inch culvert connecting the NW 97 Ave Canal to the Miami Canal
- Relocating the existing 24-inch sewer line between NW South River Drive and Frontage Road
- Upgrading roadway lighting with LED luminaires
- Upgrading traffic and pedestrian signage, pavement markings, signalization, and lighting
- Installing new Intelligent Transportation System (ITS)
LANE CLOSURE INFORMATION:
There are no current construction activities or lane closures.
SECOND-LEVEL OVERPASS
The second-level overpass opened to traffic in May 2025 featuring four new bridges on SR 25/US 27/Okeechobee Road to cross NW 116 Way/Hialeah Gardens Boulevard, along with new access ramps to Frontage Road and Hialeah Gardens High School.
To learn how to navigate the newly constructed overpass, click here.
PUBLIC INVOLVEMENT:
A Public Meeting was held both, in-person and virtually, on Wednesday, April 27, 2022 at the Medley Town Hall. Click here to watch the recording.