The NW 116 Way Bridge will be Closed for a Traffic Shift May 19 - 22 2023
On Monday, May 22, 2023, all travel lanes along the NW 116 Way bridge, between State Road (SR) 25/US 27/Okeechobee Road and NW South River Drive, will be shifted west while the contractor begins the demolition and reconstruction efforts on the east side of the bridge. Two travel lanes will be maintained in each direction. This shift will be implemented 24 hours, 7 days a week for approximately six months.