EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

State of Florida Department of Transportation logo - link to the FDOT website
Florida Department of

TRANSPORTATION

South Florida Roads (Miami-Dade and Monroe Counties)

 
Welcome
 

The Florida Department of Transportation (FDOT) is developing the design for a roadway project along State Road (SR) 953/LeJeune Road/SW-NW 42 Avenue from SW 8 Street to NW 11 Street, in Miami-Dade County. 

WORK TO BE PERFORMED:

  • Providing a southbound left-turn and U-turn movements at SW 5 Terrace
  • Closing median openings at SW 4 Street and SW 2 Terrace
  • Adding a northbound directional median opening at SW 2 Street
  • Closing two abandoned driveways at NW 4 Street
  • Repaving and restriping the road
  • Improving stormwater drainage system
  • Replacing traffic signal at the NE corner of Flagler Street
  • Upgrading signs and pavement markings
  • Replacing all pedestrian push buttons
  • Enhancing traffic signals
  • Updating lighting
  • Relocating palm trees                                                                                                           

MAINTENANCE OF TRAFFIC

During construction, temporary lane closures during non-peak hours and detours may affect traffic. Access to adjacent businesses and residences will be maintained.

Public Meeting:

FDOT will host a Hybrid Public Meeting for those interested in learning more about this design project. 

Time and DateTuesday, September 26, 2023 starting at 6 p.m.

Location:

In-Person Meeting:

Miami-Dade College Eduardo J Padron Campus, Room 201

627 SW 27 Avenue

Miami, FL 33135

Virtual Meeting:

Visit the link to attend: https://attendee.gotowebinar.com/register/3456502152229449312

Participants can also call in by dialing +1 (415) 655-0060; Access code: 706-357-316

Project At-A-Glance
 
map
Construction Start Date
August 2025

Construction Cost
$3.2 million

Lengths and Limits
SR 953/LeJeune Road/SW-NW 42 Avenue from SW 8 Street to NW 11 Street

FDOT Project Manager
Alejandro Jaureguy, P.E.


FDOT Project Manager
Ramon Tesone, P.E.

Alvarez Engineering


Community Outreach Specialist
Rodolfo Roman

Infinite Source Communications Group

O: 305-470-5477

C: 786-519-7160

Rodolfo.Roman@dot.state.fl.us