THIS PROJECT WAS COMPLETED IN APRIL 2024
The Florida Department of Transportation (FDOT) has completed the roadway project along State Road (SR) 994/Quail Roost Drive/SW 200 Street on April 4, 2024 in Miami-Dade County.
WORK PERFORMED:
- Repaved and restriped the roadway
- Installed new drainage structures in the swale areas along Quail Roost Drive
- Relocated and/or removed landscape
- Upgraded signalization features at the intersection of SW 147 Avenue/Naranja Road
- Upgraded vehicular signage throughout the corridor
Project At-A-Glance
Start Date |
---|
July 2023 |
Est. Completion |
Spring 2024 |
Construction Cost |
$4.1 million |
Lengths and Limits |
From SR 997/Krome Avenue to SR 825/SW 137 Avenue |
FDOT South Miami-Dade and Monroe Counties Resident Engineer |
Dru Badri, P.E. |
FDOT Construction Project Manager |
Carmen Negron, P.E. |
FDOT Project Administrator |
Ricardo Sargen, P.E. |
Contractor |
General Asphalt Company, LLC. |
Community Outreach Specialist |
Christian Gonzalez
(786) 837-4884 |