The Florida Department of Transportation (FDOT) began a roadway project the week of November 27, 2023. The project limits extend along State Road (SR) 9336/SW 392 Street from Everglades National Park to SR 5/US 1 in Miami-Dade County.

WORK TO BE PERFORMED

  • Repaving and restriping the roadway
  • Widening roadway and shoulders
  • Installing new drainage structures
  • Replacing expansion joints on bridges (3 bridges)
  • Repairing damaged sidewalks
  • Installing a new 12-foot shared-used path between NW 13 Avenue and NW 8 Avenue
  • Upgrading existing bus stops
  • Retrofitting light poles with LED bulbs between NW 6 Avenue and NW 3 Avenue
  • Installing solar powered speed feedback signs

LANE CLOSURE INFORMATION

Travel lanes and sidewalks will be closed during non-peak hours on non-event days. Non-peak hours are:

  • 445987-1-52-01: SR 9336/Ingraham Highway/SW 392 Street/SW 376 Street corridor from Everglades National Park to the SW 192 Avenue Intersection
  • There are no hourly limits
  • Traffic will be managed by flagging operation
  • 445989-1-52-01: SR 9336/ SW 392 Avenue from SW 376 Street to south of SW 344 Street
  • 9 a.m. to 4 p.m., weekdays and weekends
  • 8 p.m. to 5:30 a.m., weekdays and weekends
  • 445992-1-52-01: SR 9336/ SW 344 Street/Palm Drive from SW 192 Avenue to SR 5/US 1
  • 9 a.m. to 4 p.m., weekdays and weekends
  • 8 p.m. to 5:30 a.m., Sunday through Thursday nights

Please select "Lane Closures" link to receive most recent Lane Closure information.  

Project At-A-Glance
 
map
Start Date
November 2023

Est. Completion
Spring 2025

Construction Cost
$15.2 million

Lengths and Limits
From Everglades National Park to SR 5/US 1

FDOT South Miami-Dade and Monroe Counties Resident Engineer
Dru Badri, P.E.

FDOT Construction Manager/Assistant Resident Engineer
George Hoffman, P.E.

FDOT Construction Project Manager
Francisco Lledo, E.I.

Construction Consulting Engineering and Inspection (CCEI) Project Manager
Tony Sabbag, C.G.C., C.C.M.

Construction Consulting Engineering and Inspection (CCEI) Senior Project Engineer
Jose E. Morales, P.E.
Colliers Engineering & Design

Contractor
Bacallao Construction & Engineering Development, LLC.

Community Outreach Specialist
Paulette Summers
C: (786) 510-3921
×