The Florida Department of Transportation (FDOT) began a roadway project the week of January 6, 2025 along SR 5/US 1 in Miami-Dade County.
FDOT Compass
COMMUNITIES
- Removing four abandoned driveways
-
Intersection improvements along SR 5/US 1 at SW 137 Avenue and at Caribbean Boulevard, including:
-
Replacing concrete sidewalks and driveways
-
Replacing curb and gutter
-
Upgrading traffic signals
-
SAFETY
- Replacing guardrails throughout the corridor
- Installing detectable warning surfaces
RESILIENCY
- Upgrading drainage systems to alleviate flooding
- Replacing bridge expansion joints
SUPPLY CHAIN
- Repaving and restriping the roadway to support the reliable and safe transport of goods, contributing to efficient supply chain operations
-
Lane widening, turnout widening and reconstruction, and medianreconstruction

TECHNOLOGY
- Upgrading pedestrian ramps, signs, detectors and signalization
WORKFORCE DEVELOPMENT
- This project creates opportunities for local contractors supporting economic growth and workforce development within the community
LANE CLOSURE INFORMATION
Work will be done in phases to reduce the effects of construction on the community. Lanes can be closed during the following hours, weekdays and weekends:
- 9 a.m. to 3:30 p.m., northbound and southbound
- 11 p.m. to 7 a,m,, northbound
- 9 p.m. to 5 a.m., southbound
Access to businesses and residences will be maintained. Lane closure information will be posted weekly on the department's website, www.southflroads.com.
DETOUR INFORMATION
Pedestrian and vehicular detours will be established at times and may exceed past the non-peak lane closure hours. Specific detour information will be provided before the corresponding construction activity is scheduled.
ALWAYS PUT SAFETY FIRST
For your safety and the safety of others, please use caution when driving, walking or biking around any construction zone. For real-time traffic information, visit: http://www.FL511.com.
PROJECT UPDATE VIDEO (MARCH 2025)
PROJECT AREA MAP

| Start Date |
|---|
| January 2025 |
Est. Completion |
| Spring 2026 |
Construction Cost |
| $12.4 million |
Lengths and Limits |
| From SW 264 Street to SR 989/SW 112 Avenue/SW 208 Drive |
FDOT South Miami-Dade& Monroe Counties Resident Engineer |
| Dru Badri, P.E. |
FDOT Project Manager |
| Francisco Lledo, P.E. |
Construction Consulting Engineering and Inspection (CCEI) Project Administrator |
| Yuriel Addine, P.E. E Plus Engineering and Construction, LLC |
Contractor |
| Bacallao Construction Engineering & Development, LLC |
Community Outreach Specialist Consultant |
| Annabella Vizcaino Quest Corporation of America C: (786) 510-6113 |