- Upgrading the existing stormwater pump system
.png)
SAFETY
- Reconstructing pedestrian curb ramps, damaged sidewalks and upgrading vehicular signals, signage and pavement markings
.png)
RESILIENCY
- Upgrading drainage pipes to improve capacity
.png)
SUPPLY CHAIN
- Repaving and restriping to preserve the service life of the road
.png)
TECHNOLOGY
- Installing pavement traffic detectors to identify vehicles at traffic signals
.png)
WORKFORCE DEVELOPMENT
- This project creates opportunities for contractors, which results in positive economic benefits for the workers and the community
LANE CLOSURE INFORMATION
Work will be done in phases to reduce the effects of construction on the community. Lanes can be closed during the following hours on non-event days:
- 9 a.m. to 3:30 p.m., daily
No construction activities will occur from 8 p.m. to 8 a.m., except during repaving and restriping work which will occur:
- 9 p.m. to 5:30 a.m., Sunday through Thursday
- 11 p.m. to 7 a.m., Friday and Saturday
| Start Date |
|---|
| January 2025 |
Est. Completion |
| Fall 2025 |
Construction Cost |
| $5.8 million |
Lengths and Limits |
| SR 5/US 1/Biscayne Boulevard from south of NE 5 Street to NE 11 Street |
FDOT South Miami-Dade Resident Engineer |
| Dru Badri, P.E. |
FDOT South Miami-Dade Assistant Resident Engineer |
| Jonathan Fundora, P.E. |
FDOT Project Manager |
| Carmen Negron, P.E. |
FDOT Project Administrator |
| Aimelis Gonzalez |
Contractor |
| Florida Engineering & Development Corp, Inc. |
Community Outreach Specialist |
| Aliyah Gomez Holt Communications, Inc. |