The Florida Department of Transportation (FDOT) started a pedestrian safety project the week of April 1, 2024, on State Road (SR) 5/US 1/N. Roosevelt Boulevard. This project improves traffic flow and pedestrian safety by coordinating the crosswalk signal with the traffic signal at the nearby intersections of Kennedy Drive/Sigsbee Road and Overseas Market.

WORK PERFORMED:

  • The Pedestrian Hybrid Beacons (PHB) were replaced with Midblock Pedestrian Signals (MPS), a standard 3-section traffic signal
  • The MPS will be synchronized with the nearby intersections at Kennedy Drive/Sigsbee Road, and Overseas Market
  • Audible Pedestrian Signals (APS) were added to coincide with visual signals to assist those with visual disabilities
Project At-A-Glance
 
map
Start Date
April 2024

Est. Completion
Spring 2024

Construction Cost
$47,000

Lengths and Limits
west of Kennedy Drive/Sigsbee Road on State Road (SR) 5/US 1/N. Roosevelt Boulevard

FDOT South Dade & Monroe Counties Resident Engineer
Dru Badri, P.E.

Construction Consulting Engineering and Inspection (CCEI) Project Manager
Tony Sabbag, C.G.C., C.C.M.

Construction Consulting Engineering and Inspection (CCEI) Senior Project Engineer
Hector Rodriguez, M.S., P.E.
H. Rodriguez Consulting Engineering, Inc.

Contractor
HorsePower Electric, Inc.

Community Outreach Specialist
Julie Brown
EXP US Services