The Florida Department of Transportation (FDOT) is scheduled to begin a bridge project the week of February 13, 2023, along State Road (SR) 5/US 1/Long Key Bridge (#900094) over the Long Key Channel at Mile Marker (MM) 64.0 in Monroe County.
 
WORK TO BE PERFORMED
  • Repairing the concrete bridge elements
  • Replacing the bridge deck expansion joints
 
Travel lanes may be closed only during non-peak hours on non-event days. Non-peak hours are: 
  • 9:30 p.m. to 5:30 a.m., Sunday through Thursday nights
Project At-A-Glance
 
map
Start Date
February 2023

Est. Completion
Summer 2024

Construction Cost
$2.4 million

Lengths and Limits
SR 5/US 1/Long Key Bridge (#900094) over the Long Key Channel (MM 64.0)

FDOT South Dade & Monroe Counties Resident Engineer
Andres Berisiartu, P.E.

Construction Consulting Engineering and Inspection (CCEI) Project Manager
Anthony Sabbag
HDR, Inc.

Construction Consulting Engineering and Inspection (CCEI) Senior Project Engineer
Hector Rodriguez, M.S., P.E.
H.Rodriguez Consulting Engineering Inc.

Contractor
M&J Construction Company of Pinellas County, Inc.

Community Outreach Specialist
Paulette Summers
Media Relations Group, LLC
 
O: (305) 254-8598
C: (786) 510-3921
×