COMMUNITY
- Upgrading pedestrian ramps and crossings at signalized intersections
.png)
SAFETY
- Adding a second right turn lane from southbound Indian Creek Drive to westbound SR 112/41 Street
- Shifting the median along Indian Creek Drive to allow for the new turn lane
- Adding a second right turn lane from southbound Indian Creek Drive to westbound SR 112/41 Street
- Shifting the median along Indian Creek Drive to allow for the new turn lane
- Adding signalization at Indian Creek Drive for the southbound dual right turn lane
- Reconstructing sidewalks, curb and gutter
.png)
RESILIENCY
- Repairing the SR 112/W 41 Street bridge deck and structural steel
- Rehabilitating the SR 112/W 41 Street bridge elements, deck expansion joints, concrete and improving bridge handrails
- Relocating and trimming existing landscape along SR A1A/Collins Avenue from 44 Street to 4700 Block
- Repaving and restriping the road
- Installing new pavement markings
.png)
TECHNOLOGY
- Upgrading existing light poles with light-emitting diodes (LED)
.png)
WORKFORCE DEVELOPMENT
- FDOT employs local contractors in an effort to provide positive economic benefits to the community
LANE CLOSURE INFORMATION
Work will be done in phases to reduce the effects to the community. Temporary lane closures may affect traffic during non-peak hours. Pedestrian detours will be established with clear signage. Access to adjacent properties will be maintained.Travel lanes and sidewalks will be closed during non-peak hours on non-event days.
Single lane closures along SR A1A/Collins Avenue may occur:
- 10 a.m. to 2 p.m., Monday - Thursday
-
6:30 p.m. to 12 a.m., Monday - Thursday
Dual lane closures along SR A1A/Collins Avenue may occur:
- 9:30 p.m. to 7:30 a.m., for northbound lanes Monday - Thursday
-
8 p.m. to 6 a.m., for southbound lanes Monday - Thursday
Single lane closures along SR A1A/Indian Creek Drive can may occur:
- 9:30 p.m. to 7:30 a.m., for northbound lanes Monday - Thursday
- 8 p.m. to 6 a.m. for southbound lanes Monday - Thursday
Bridge work and lane closures will be performed during nighttime work hours:
- 8 p.m. to 7:30 a.m. Sunday - Thursday
| Start Date |
|---|
| August 2025 |
Est. Completion |
| Fall 2026 |
Construction Cost |
| $9.1 million |
Lengths and Limits |
| SR A1A/Collins Avenue from 44 Street to 4700 block and Indian Creek Drive from 41 Street to 44 Street and SR 112/W 41 Street over the Indian Creek Waterway Bridge |
FDOT North Miami-Dade Resident Engineer |
| Ivan Hay, P.E. |
FDOT Construction Project Manager |
| Colin W. Johnson, P.E. |
Construction Consulting Engineering and Inspection (CCEI) Senior Project Engineer |
| Sergio Gonzalez, P.E. |
Contractor |
| Florida Engineering & Development Corps. |
Senior Community Outreach Specialist |
| Melissa J. Rodriguez
HML Public Outreach, LLC |