EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

State of Florida Department of Transportation logo - link to the FDOT website
Florida Department of

TRANSPORTATION

South Florida Roads (Miami-Dade and Monroe Counties)

 
Welcome
 

The Florida Department of Transportation (FDOT) has completed the design for a pedestrian bridge replacement project over State Road (SR) 90/US 41/SW 8 Street and the C-4 Canal west of SW 109 Avenue including roadway work along SW 109 Avenue from SW 7 Terrace to SW 6 Street in Miami-Dade County.

WORK TO BE PERFORMED:

  • Installing a pedestrian bridge over SW 8 Street and the C-4 Canal, west of SW 109 Avenue
  • Providing pedestrian plazas with elevators and stairs on the north-end and south-end landings of the pedestrian bridge
  • Installing a signalized east/west crosswalk along SW 109 Avenue, north of SW 7 Terrace
  • Upgrading pedestrian signals, signs and curb ramps
  • Closing existing historical bridge over the C-4 Canal east of SW 109 Avenue
  • Eliminating north/south crosswalks at the SW 8 Street and SW 109 Avenue intersection
  • Removing remaining portions of existing structure in conflict with proposed improvements

Construction is expected to begin in fall 2024 and last about two years. During construction, temporary lane closures and roadway detours will occur during non-peak hours. Pedestrian detours will be established with proper signage. Access to adjacent neighborhoods and businesses will be maintained.

Project At-A-Glance
 
map
Construction Start Date
October 2024

Construction Cost
$38 million

Lengths and Limits
SR 90/US 41/SW 8 St at SW 109 Ave and SW 109 Ave from SW 7 Ter to SW 6 St

FDOT Design Project Manager
Carmen Bermudez, P.E.


Consultant Design Project Engineer
Kathy Lajo, P.E.

BCC Engineering


Community Outreach
Tish Burgher

FDOT Communications Manager

O: (305) 470-5277