The Florida Department of Transportation (FDOT) is developing the design for a roadway project at the intersection of State Road (SR) 5/US 1 and SW 137 Avenue, in Miami-Dade County.
WORK TO BE PERFORMED:
- Modifying access to Tropical Avenue to right turn only and constructing a traffic separator
- Relocating the U-turn movement south of the intersection
- Extending the traffic separator to increase left turn storage
- Adding a northbound left turn movement towards to the west
- Enhancing pedestrian ramps, signs and pavement markings
- Adding a new traffic light
- Repaving and restriping the roadway
- Relocating existing drainage and landscape
- Upgrading lighting
MAINTENANCE OF TRAFFIC:
During construction, temporary lane closures during non-peak hours and detours may affect traffic. Access will be maintained. Flaggers will be used to control traffic flow.
In-Person Public Meeting will be held at:
A public meeting was held at the Naranja Branch Library, 14850 SW 280 Street, Miami, FL 33032. To watch the meeting click the link: https://attendee.gotowebinar.com/register/8570175691526303247
Construction Start Date |
---|
August 2024 |
Construction Cost |
$1.8 million |
Lengths and Limits |
SR 5/US 1 at SW 137 Avenue |
FDOT Project Manager |
Joaquin de la Cruz, P.E. |
Consultant Project Manager |
Allan Sequeira, P.E. CORE Engineering Group, LLC |
Community Outreach Specialist |
Rodolfo Roman Infinite Source Communications
O: 305-470-5477 |