The Florida Department of Transportation (FDOT) is developing the design for a roadway project located at the intersection of SR 5/US 1 and SW 17 Avenue, in Miami-Dade County.
WORK TO BE PERFORMED:
- Converting the existing left turn movements to a protected left turn only for both southound and northbound directions
- Improving the existing traffic signal
- Extending the length of the existing left turn lanes along the northbound and southbound direction to increase vehicular capacity
- Repaving and restriping the road
- Upgrading existing vehicular signage
MAINTENANCE OF TRAFFIC
During construction, there will be temporary lane closures during non-peak hours and detours will have effects on traffic. Pedestrian detours will be established with clear signage. Access to adjacent businesses and neighborhoods will be maintained.
Construction Start Date |
---|
February 2025 |
Construction Cost |
$707,000 |
Lengths and Limits |
State Road (SR) 5/US 1 and SW 17 Avenue |
FDOT Project Manager |
Vicky Zulueta, P.E. |
FDOT Consultant Project Manager |
Carlos Verson, P.E. TRACE |
Community Outreach Specialist |
Rodolfo Roman Infinite Source Communications Group O: 305-470-5477 C:786-519-7160 |