The Florida Department of Transportation (FDOT) is developing the design for two roadway projects along State Road (SR) 860/Miami Gardens Drive from NW 27 Avenue to NE 5 Avenue, in Miami-Dade County.
WORK TO BE PERFORMED:
- Closing abandoned driveways
- Repaving and restriping the road
- Improving stormwater drainage to address ponding issues
- Adjusting manholes
- Enhancing damaged sidewalks, driveways and curb and gutter
- Upgrading vehicular signing and pavement markings
- Improving pedestrian signalization and crosswalks at signalized intersections
- Adding countdown pedestrian signals
- Enhancing lighting at signalized intersections
- Trimming landscape to improve intersection sight distance
MAINTENANCE OF TRAFFIC
During construction, temporary lane closures during non-peak hours and detours may affect traffic. Access to adjacent businesses and residences will be maintained.
A hybrid Public Meeting was held Tuesday, June 13, 2023 at the North Dade Regional Library, 2455 NW 183 Street, Miami, FL 33056.
To watch the video visit https://attendee.gotowebinar.com/register/5848973481073371487
Construction Start Date |
---|
January 2025 |
Construction Cost |
$9.6 (Combined) |
Lengths and Limits |
SR 860/Miami Gardens Drive from NW 27 Avenue to NE 5 Avenue |
FDOT Project Manager |
Claudia Gutierrez, P.E. |
Consultant Design Project Engineer |
Shan Patel, P.E. EAC Consulting, Inc. |
Consultant Design Project Engineer |
Mario B Rojas IV, PE Choice Engineering |
Community Outreach Specialist |