EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

State of Florida Department of Transportation logo - link to the FDOT website
Florida Department of

TRANSPORTATION

South Florida Roads (Miami-Dade and Monroe Counties)

 
Welcome
 

The Florida Department of Transportation (FDOT) is developing the design for a roadway project along State Road (SR) 5/US 1/Overseas Highway from Mile Marker (MM) 36.6 to MM 38.4, in Monroe County.  

WORK TO BE PERFORMED: 

  • Repaving and restriping the roadway
  • Repairing the shoulder
  • Installing sod at unpaved shoulders
  • Upgrading guardrail and connections to the bridges
  • Replacing the signing and pavement markings

MAINTENANCE OF TRAFFIC: 

During construction, temporary lane closures during non-peak hours and detours may affect traffic. Access to the Bahia Honda State Park will be maintained. Flaggers will be used to control traffic flow.  

Project At-A-Glance
 
map
Construction Start Date
June 2024

Construction Cost
$3.5 million

Lengths and Limits
SR 5/US 1/Overseas Highway From MM 36.6 to MM 38.4

FDOT Project Manager
Jose Barrera, P.E.


Consultant Project Manager
Pablo Bielecki, P.E.

Technika Consulting


Community Outreach Specialist
Rodolfo Roman

Infinite Source Communications

O: 305-470-5477

Rodolfo.Roman@dot.state.fl.us