Welcome
The Florida Department of Transportation (FDOT) has begun a Roadway project along County Line Road in Miami-Dade County.
WORK TO BE PERFORMED
- Widening the shoulder and roadway at various locations
- Removing damaged concrete and installing pedestrian curb ramps, sidewalks and curb and gutter at various locations
- Installing new stormwater drainage structures
- Installing pedestrian crosswalks and detectable warning surfaces
- Replacing guardrails at various points
- Modifying landscape at various locations
- Enhancing pedestrian street lighting at select locations
- Upgrading bus stop locations
- Upgrading signage and pavement markings
- Repaving and restriping the road
LANE CLOSURE INFORMATION
Travel lanes may be closed only during nonpeak hours on nonevent days. Nonpeak hours are:
- 9 a.m. to 3:30 p.m., Sunday through Thursday
No construction activities shall be performed from 8 p.m. to 8 a.m. except for repaving and restriping the roadway, which shall occur from:
- 9:30 p.m. to 5:30 a.m., Sunday through Thursday nights
- 11 p.m. to 7 a.m., Friday and Saturday nights
Project At-A-Glance
Start Date |
---|
October 2023 |
Est. Completion |
Summer 2024 |
Construction Cost |
$2.4 Million |
Lengths and Limits |
SR 852/County Line Rd From NW 27 Avenue to NW 1700 Block |
FDOT North Miami-Dade Resident Engineer |
Ivan Hay, P.E. |
FDOT Project Manager |
John M. Garzia, P.E. |
CCEI Project Administrator |
Nick Arango, E.I. |
Contractor |
OHLA USA, Inc. |
Community Outreach Specialist |
Jeff Baquedano Quest Corporation
C: (786) 510-6113 |