The Florida Department of Transportation (FDOT) began the construction of a design-build ITS replacement project during the week of May 9, 2021. This project will replace and update ITS devices throughout Miami-Dade County.
WORK TO BE PERFORMED
- Replacing ITS cabinets
- Upgrading and migrating ITS devices to current standards
- Replacing Dynamic Message Signs (DMS)
- Replacing Closed Circuit Television Cameras (CCTV) and installing new poles
PROJECT SCHEDULE
Design Began: July 12, 2021
Construction Duration: spring 2022 - spring 2024
LANE CLOSURE INFORMATION
Travel lanes shall be closed only during nonpeak hours on nonevent days. Nonpeak hours are:
- 9 p.m. to 5 a.m., Sunday through Thursday nights
- 10 p.m. to 8 a.m., Friday and Saturday night
Tomorrow, Saturday April 13, there will be two northbound lanes closed along US 1 just north of Killian Drive to replace the DMS structure bolts from 7 a.m. to 9 a.m.
LOCATIONS OF WORK INCLUDE:
- SR 9A/I-95 Various Locations
- SR 826 Various Locations
- US 1/South Dixie Highway
- SR 986/SW 72 Street/Sunset Drive
- SR 976/SW 40 Street/Bird Road
- SW 56 Street/Miller Drive
- SR 90/US 41/SW 8 Street/Tamiami Trail
- SR 948/NW 36 Street
Start Date |
---|
May 2021 |
Est. Completion |
Spring 2024 |
Construction Cost |
$7 Million |
Lengths and Limits |
Various Locations throughout Miami-Dade County along SR 9A/I-95, SR 826, US 441, SR 9 and US 1. |
FDOT South Miami-Dade and Monroe County Resident Engineer |
Dru Badri, P.E. |
FDOT Project Manager |
Carmen E. Negron, P.E. |
Construction Consulting Engineering and Inspection (CCEI) Senior Project Engineer |
Nelson Castillo, P.E. A&P Consulting Transportation Engineers |
Design-Build Team |
Horsepower Electric Inc. |
Senior Community Outreach Specialist |
Sandra Bello
HML Public Outreach, LLC |