447046-1-52-01 : S.R. 90/U.S. 41/SW 8 St at SW 109 Ave Pedestrian Bridge Replacement Project
  • LANE CLOSURE INFORMATION

    Work will be done in phases to reduce the effects of construction on the community.

    Lanes can be closed during the following hours:

    • 10 p.m. to 5:30 a.m., Sunday through Thursday nights
    • 11 p.m. to 6 a.m., Friday and Saturday nights

    Roadway lane closures and detours will be established during any overhead work and as necessary to ensure safety during construction.

    Brief, temporary lane closures may occur daily on westbound SW 8 Street between SW 109 Avenue and SW 112 Avenue to safely accommodate crane lifting operations. These closures will be short in duration, and traffic will resume immediately after each lift is completed. 

445998-1-52-01/2, 446003-1-52-01 : S.R. 972/SW 22 St/SW 3 Ave/SW 13 St/Coral Way from SW 22 Ave to SW 17 Ave and from SW 12 Ave to Brickell Ave
  • LANE CLOSURE INFORMATION

    Work will be done in phases to reduce the effects of construction on the community.

    Lanes can be closed during the following hours

    Weekdays, nights and weekends: 

    • 9 p.m. to 6 a.m.
    • 9 a.m. to 3 p.m.

    Stormwater drainage work closures will be in place:

    • 11 p.m. to 5 a.m., Sunday through Thursday nights
443913-1-52-01 : S.R. 886/Port Boulevard from S.R. 5/U.S. 1/ Biscayne Boulevard to PortMiami
  • LANE CLOSURE INFORMATION

    Work will be done in phases to reduce the effects of construction on the community. Lanes can be closed during the following hours on non-event days:

    • Single and double-lane closures along S.R. 886/Port Boulevard:
    • 5 p.m. to 5 a.m., Tuesdays through Thursdays
    • Single and double-lane closures along S.R. 5/Biscayne Boulevard:
    • 8 p.m. to 6 a.m., Sundays through Thursdays
    • 11 p.m. to 9 a.m., Fridays and Saturdays
    • Westbound S.R. 886/Port Boulevard: Up to two lanes will be closed from 7 p.m. to 7 a.m., Tuesday, August 18 through Thursday, August 20, 2026.
    • Eastbound S.R. 886/Port Boulevard: Up to two lanes will be closed from 5 p.m. to 5 a.m., Tuesday, August 18 through Thursday, August 20, 2026.
    • ​​​Please note that at least one lane in each direction will remain open to traffic at all times. This schedule may change due to weather or unforeseen circumstances.