The Florida Department of Transportation (FDOT) is developing the design for a roadway project at the intersection of State Road ( SR) 5/US 1 and Caribbean Boulevard, in Miami-Dade County.
WORK TO BE PERFORMED:
- Replacing traffic signalization
- Installing pedestrian pushbutton detectors and countdowns
- Upgrading sidewalk and curb ramps
- Enhancing traffic signs
MAINTENANCE OF TRAFFIC:
During construction, temporary lane closures and detours will affect traffic. Pedestrian detours will be established with clear signage. Access to adjacent businesses and neighborhoods will be maintained.
Construction Start Date |
---|
September 2024 |
Construction Cost |
$653,081 |
Lengths and Limits |
SR 5/US 1 at Caribbean Boulevard |
FDOT Project Manager |
Kira Leon, P.E. |
FDOT Consultant Engineer |
Jose A. Lopez, P.E. HBC Engineering Company |
Community Outreach Specialist |
Rodolfo Roman Infinite Source Communications C:786-519-7160 O: 305-470-5477 |