The Florida Department of Transportation (FDOT) is developing the design for a roadway project located along State Road (SR) 5/US 1/Biscayne Boulevard from north of NE 105 Street to south of NE 123 Street, in Miami-Dade County.
WORK TO BE PERFORMED:
- Repairing damaged driveways
- Reconstructing damaged sidewalks and upgrading curb ramps
- Installing new crosswalks at five signalized intersections
- Installing speed feedback signs in the northbound and southbound directions
- Repaving and restriping the roadway
- Adjusting manholes
- Upgrading signing and pavement markings
- Trimming trees obstructing the roadway
- Upgrading pedestrian push buttons
- Improving lighting at signalized intersections
MAINTENANCE OF TRAFFIC
During construction, temporary lane closures and detours will affect traffic. Pedestrian detours will be established with clear signage. Access to adjacent businesses and neighborhoods will be maintained
Construction Start Date |
---|
October 2024 |
Construction Cost |
$2.8 million |
Lengths and Limits |
SR 5/US 1/Biscayne Boulevard from north of NE 105 Street to south of NE 123 Street |
FDOT Project Manager |
Paola Martinez, P.E. |
FDOT Project Manager |
Pablo Bielecki, P.E., Technika Consulting, Inc. Technika Consulting, Inc. |
Community Outreach Specialist |
Rodolfo Roman Infinite Source Communications Group O: 305-470-5477 C: 786-519-7160 |