The Florida Department of Transportation (FDOT) is developing the design for two roadway projects located along SR 970/SR 5/Downtown Distributor Ramps from South Miami Avenue to SE 2 Avenue and along SR 9A/I-95 from SR 90/SW 8 Street to S Dixie Highway, in Miami-Dade County.
WORK TO BE PERFORMED:
SR 970/SR 5/Downtown Distributor Ramps from South Miami Avenue to SE 2 Avenue
- Rehabilitating the concrete pavement
- Repaving and restriping the road
- Reconstructing guardrail
- Adjusting manholes
- Upgrading existing damaged curb and gutter and pavement markings
- Reconstructing damaged sidewalks at pedestrian crossings
- Upgrading signage
- Trimming landscape
- Providing crosswalks and countdown signals with push buttons
SR 9A/I-95 from SR 90/SW 8 Street to S Dixie Highway
- Repaving and restriping the shoulder pavement
- Upgrading guardrail
- Upgrading vehicular signs
- Replacing pavement markings
- Installing signage
Public Involvement:
In-Person Public Meeting will be held at:
A meeting was held at the Jose Marti Gym, 434 SW 3 Avenue, Miami, FL 33130 on Tuesday, May 10, 2022.
To view the meeting video click here.
Construction Start Date |
---|
January 2024 |
Construction Cost |
$2.6 million (combined) |
Lengths and Limits |
SR 970/SR 5/Downtown Distributor Ramps from South Miami Avenue to SE 2 Avenue and along SR 9A/I-95 from SR 90/SW 8 Street to S Dixie Highway |
FDOT Project Manager |
Carmen Bermudez, P.E. |
FDOT Consultant Engineer |
Frank Panellas, P.E. TRACE Consultants |
Community Outreach Specialist |
Rodolfo Roman Infinite Source Communications Group C:786-519-7160 O:305-470-5477 Rodolfo.Roman@dot.state.fl.us
|