Welcome
The Florida Department of Transportation (FDOT) has begun a bridge rehabilitation project along Port Boulevard in the City of Miami.
WORK TO BE PERFORMED
- Reinforcing concrete
- Replacing the bridge expansion joints
- Restoring the existing sidewalk
LANE CLOSURE INFORMATION
Two eastbound lanes and two westbound lanes along Port Boulevard are temporarily closed around the clock. One outside eastbound lane and one outside westbound lane are open along Port Boulevard.
Bridge lifting operations can occur:
- 9 p.m. to 5 a.m., Monday through Thursday
Project At-A-Glance
Start Date |
---|
August 2022 |
Est. Completion |
Late 2023 |
Construction Cost |
$2.8 million |
Lengths and Limits |
SR 886/Port Boulevard over the Intracoastal Waterway (bridge numbers: 875000 & 875001) |
FDOT North Miami-Dade Resident Engineer |
Ivan Hay, P.E. |
FDOT Project Manager |
Dru Badri, P.E. |
Construction Consulting Engineering and Inspection (CCEI) Project Engineer |
Juan Alonso A² Group, Inc. |
Contractor |
Kiewit Infrastructure South Co. |
Community Outreach Specialist |
Sergies Duarte Quest
C: (305) 216-3617 |