The Florida Department of Transportation (FDOT) has begun a roadway project along NW 27 Avenue in Miami-Dade County.
WORK TO BE PERFORMED
- Creating a new signalized intersection at NW 19500 Block
- Replacing traffic signals at NW 207 Street
- Improving pedestrian signals at NW 203 Street and NW 211 Street
- Replacing traffic separator between NW 21000 Block and NW 211 Street
- Improving lighting at various intersections
- Stabilizing erosion of the west canal bank north of NW 207 Street
- Modifying landscaping at various locations
- Replacing bridge joints at NW 203 Street
- Installing new special driveway at NW 203 Street
- Replacing pedestrian curb ramps, sidewalks and curb and gutter at various locations
- Adjusting utility manholes and valves at several locations
- Replacing guardrail at various locations
- Upgrading signs and pavement markings
- Repaving and restriping roadway
- 9:30 a.m. to 3:30 p.m., weekdays and weekends
- 9 p.m. to 5:30 a.m., Sunday through Thursday
- 11 p.m. to 7 a.m., Friday and Saturday
Start Date |
---|
July 2022 |
Est. Completion |
Spring 2023 |
Construction Cost |
$2.9 million |
Lengths and Limits |
From south of NW 203 Street to south of NW 215 Street and NW 27 Avenue at 19500 Block |
FDOT North Miami-Dade Resident Engineer |
Ivan Hay, P.E. |
FDOT Project Manager |
Colin W. Johnson, P.E. |
CCEI Project Engineer |
Osvaldo “Ossie” Larrazabal, P.E. Solid Consulting Engineers |
Contractor |
Weekley Asphalt Paving, Inc. |
Community Outreach Specialist |
Sergies Duarte Quest
C: (305) 216-3617 |