Landscape installation was completed in March 2023.
This project is currently in the establishment period.

The Florida Department of Transportation (FDOT) has begun a landscape project along SR 7/US 441/NW 7 Avenue in Miami-Dade County.

WORK TO BE PERFORMED

  • Providing landscape within the recently installed medians along the corridor
  • Installing palm trees and shade trees in various locations
LANE CLOSURE INFORMATION
 
Temporary lane closures can occur during non-peak hours on non-event days, nights and weekends from:
  • 9:30 a.m. to 3:30 p.m., weekdays and weekends
  • 9 p.m. to 5:30 a.m., Sunday through Thursday
  • 11 p.m. to 7 a.m., Friday and Saturday
Project At-A-Glance
 
map
Start Date
September 2022

Est. Completion
Spring 2025

Construction Cost
$759,000

Lengths and Limits
From Little River Drive to NW 118 Street and from NW 143 Street to NW 157 Street

FDOT North Miami-Dade Resident Engineer
Ivan Hay, P.E.

FDOT Project Manager
Dru Badri, P.E.

FDOT Project Administrator
Igor Caicedo

Contractor
Blue Native of the Florida Keys

Community Outreach Specialist
Jeff Baquedano
Quest Corporation

C: (786) 510-6113
O: (305) 640-7462
Jeff.Baquedano@dot.state.fl.us

×