Welcome
The Florida Department of Transportation (FDOT) began a roadway project the week of May 8, 2023 along SR A1A/MacArthur Causeway in Miami-Dade County.
WORK TO BE PERFORMED
- Widening the roadway to provide a continuous bike lane
- Modifying drainage structures
- Upgrading signing and pavement markings
- Installing delineators to protect the bike lane
LANE CLOSURE INFORMATION
Travel lanes may be closed only during nonpeak hours on nonevent days. Nonpeak hours are:
- 9 p.m. to 5:30 a.m., weekdays and weekends
Striping operations will take place during nighttime workhours.
Project At-A-Glance
Start Date |
---|
May 2023 |
Est. Completion |
Fall 2023 |
Construction Cost |
$935,009 |
Lengths and Limits |
State Road (SR)/A1A/MacArthur Causeway From SR 5/Biscayne Boulevard to SR 997/Alton Road |
FDOT North Miami-Dade County Resident Engineer |
Ivan Hay, P.E. |
FDOT Construction Project Administrator II |
Ileana Guillen Alvarez |
Contractor |
American Design Engineering Construction Inc. |
Senior Community Outreach Specialist |
Melissa J. Rodriguez
HML Public Outreach, LLC |