Flagler Street (SR 968) Pedestrian Safety Improvement Project
FIN No.422700-1-52-01
WPI No. N/A
Project Limits
SW 8th Street from Beacom Boulevard to SW 4th Avenue
Project Summary
This project includes: roadway paving and restriping; sidewalk and driveway replacement at designated locations; replacing roadway signs and signalizations; removing and relocating existing landscape; and new curb ramps that will satisfy current Americans with Disabilities Act (ADA) Standards.
Start Date: July, 2008
Completion: Summer 2009
Construction Cost: $2.6 million
Project Team:
FDOT South Miami-Dade Resident Engineer:
Mario Cabrera, P.E.
FDOT Project Manager:
Hector A. Rodriguez, P.E.
FDOT Project Administrator
Emilio Zamora
Contractor
H & J Asphalt, Inc.
Public Information
Jeannette Lazo
(305) 499-2417 or (305) 224-3618