Flagler Street (SR 968) Pedestrian Safety Improvement Project

FIN No.422700-1-52-01
WPI No. N/A

 

Project Limits

SW 8th Street from Beacom Boulevard to SW 4th Avenue

 

Project Summary

This project includes: roadway paving and restriping; sidewalk and driveway replacement at designated locations; replacing roadway signs and signalizations; removing and relocating existing landscape; and new curb ramps that will satisfy current Americans with Disabilities Act (ADA) Standards.

 

 

Start Date: July, 2008

 

Completion: Summer 2009

 

Construction Cost: $2.6 million

 

Project Team:

 

FDOT South Miami-Dade Resident Engineer:

Mario Cabrera, P.E.

 

FDOT Project Manager:

Hector A. Rodriguez, P.E.


FDOT Project Administrator

Emilio Zamora

 

Contractor

H & J Asphalt, Inc.

 