Home > South Miami Dade > Palmetto Expressway Expansion Project (SR 826)

 

Palmetto Expressway Expansion Project (SR 826)

FIN No. 249035-1-52-01
WPI No. 249035

 

Project Limits

Just north of SW 40th Street / Bird Road to just north of SW 72nd Street / Sunset Drive, including the SR 874 Interchange

 

Project Summary

This Design/Build Project includes widening SR 826 to include one new travel lane in each direction; reconstructing on and off ramps at the Bird Road, Miller Drive and SR 874 Interchanges and numerous roadway enhancements including: new storm water drainage; new roadway lighting and signage; new water mains (installed in coordination with Miami-Dade Water and Sewer Department) noise walls north of Bird Road and extensive landscaping.

 

Start Date: November 2008

 

Completion: Summer 2012

 

Construction Cost: $177 million

 

Project Team:

FDOT South Miami-Dade Resident Engineer
Mario Cabrera, P.E.

 

FDOT Construction Project Manager
Dari Vorce

 

FDOT Design Project Manager
Jason Chang, P.E.

 

Construction Engineering & Inspection
New Millennium Engineering

 

Contractor
The de Moya Group, Inc.

 

Public Information Specialist

Jeannette Lazo
(305) 499-2417
Jeannette.Lazo@dot.state.fl.us