<?xml version="1.0" encoding="utf-8"?>
<?xml-stylesheet type="text/xsl" href="http://www.fdotmiamidade.com/rss/rss2html.xsl"?>
<!-- Developed by K2B solution -->
<rss version="2.0" xmlns:dc="http://purl.org/dc/elements/1.1/">
 <channel>
  <description/>
  <link>http://www.fdotmiamidade.com/</link>
  <title>FLORIDA DEPARTMENT OF TRANSPORTATION: DISTRICT 6</title>
  <dc:date>2002-05-06</dc:date>
  <image>
   <url/>
   <link>http://www.fdotmiamidade.com/</link>
   <title>FLORIDA DEPARTMENT OF TRANSPORTATION: DISTRICT 6</title>
   <description>To subscribe just copy and paste the URL of this page into your RSS reader</description>
  </image>
  <item>
   <description/>
   <link/>
   <title>Category :South Miami-Dade</title>
   <guid>2</guid>
  </item>
  <item>
   <description>&lt;p&gt;&#10;&#9;The project includes constructing a trail for bicyclists and pedestrians; constructing a bicycle and pedestrian bridge over the entrance ramp to State Road (&lt;span data-scayt_word=&quot;S.R&quot; data-scaytid=&quot;1&quot;&gt;S.R&lt;/span&gt;.) 878 along &lt;span data-scayt_word=&quot;S.R&quot; data-scaytid=&quot;2&quot;&gt;S.R&lt;/span&gt;. 5/&lt;span data-scayt_word=&quot;U.S.1&quot; data-scaytid=&quot;3&quot;&gt;U.S.1&lt;/span&gt;; installing lighting, signage and fencing at the &lt;span data-scayt_word=&quot;Dadeland&quot; data-scaytid=&quot;4&quot;&gt;Dadeland&lt;/span&gt; South and &lt;span data-scayt_word=&quot;Dadeland&quot; data-scaytid=&quot;5&quot;&gt;Dadeland&lt;/span&gt; North &lt;span data-scayt_word=&quot;Metrorail&quot; data-scaytid=&quot;6&quot;&gt;Metrorail&lt;/span&gt; stations; cleaning out the Snapper Creek Canal sediment to restore its water flow; installing a wall with railings along the south bank of the Snapper Creek Canal; installing new signs and traffic signals at intersections; installing pedestrian ramps at intersections; &lt;span data-scayt_word=&quot;repaving&quot; data-scaytid=&quot;7&quot;&gt;repaving&lt;/span&gt; and &lt;span data-scayt_word=&quot;restriping&quot; data-scaytid=&quot;8&quot;&gt;restriping&lt;/span&gt; the intersections; and adding landscaping and decorative pavement.&lt;/p&gt;&#10;</description>
   <link>http://www.fdotmiamidade.com/current-projects/south-miami-dade/m-path-extension-bicycle-and-pedestrian-trail-.html</link>
   <title>M-Path Extension Bicycle and Pedestrian Trail </title>
   <dc:date>2010-10-01</dc:date>
   <guid>41</guid>
  </item>
  <item>
   <description>&lt;p&gt;&#10;&#9;&lt;img alt=&quot;&quot; src=&quot;/userfiles/images/sign.jpg&quot; style=&quot;margin: 5px; width: 78px; float: right; height: 78px&quot; /&gt;&lt;span style=&quot;color: #ff0000&quot;&gt;&lt;strong&gt;Completed in April&amp;nbsp;2012&lt;/strong&gt;&lt;/span&gt;&lt;/p&gt;&#10;&lt;p&gt;&#10;&#9;The intent of this project is to enhance the area by: reconstructing, rehabilitating and widening the roadway; installing a new water main system and replacing drainage structures; installing median traffic separators at various locations; rebuilding sidewalks, driveways and curb ramps to meet Americans with Disabilities Act (ADA) standards; replacing curb and gutter at several locations; upgrading lighting, traffic and pedestrian signs and signals; widening and rehabilitating two bridges; and&amp;nbsp;&lt;span class=&quot;scayt-misspell&quot; data-scayt_word=&quot;repaving&quot; data-scaytid=&quot;1&quot;&gt;repaving&lt;/span&gt; and &lt;span class=&quot;scayt-misspell&quot; data-scayt_word=&quot;restriping&quot; data-scaytid=&quot;3&quot;&gt;restriping&lt;/span&gt; the roadway.&lt;/p&gt;&#10;</description>
   <link>http://www.fdotmiamidade.com/current-projects/south-miami-dade/sr-5south-dixie-hwyus1-from-sw-264-st-to-sw-288-st.html</link>
   <title>SR 5/South Dixie Hwy/US1 from SW 264 St to SW 288 St</title>
   <dc:date>2010-01-01</dc:date>
   <guid>55</guid>
  </item>
  <item>
   <description>&lt;p&gt;&#10;&#9;This project will consist of adding an additional turn lane on northbound US 1 to turn west on Marlin Road; and an additional turn lane on southbound US 1 to turn east on Marlin Road. Other construction activities include minor drainage work; widening of the median and rebuilding the pedestrian ramps at the intersection. New traffic lights and traffic signs will also be added; and finishing the project with &lt;span class=&quot;scayt-misspell&quot; data-scayt_word=&quot;repaving&quot; data-scaytid=&quot;1&quot;&gt;repaving&lt;/span&gt; and &lt;span class=&quot;scayt-misspell&quot; data-scayt_word=&quot;restriping&quot; data-scaytid=&quot;3&quot;&gt;restriping&lt;/span&gt; the roadway.&lt;/p&gt;&#10;</description>
   <link>http://www.fdotmiamidade.com/current-projects/south-miami-dade/sr-5us-1-at-marlin-rd.html</link>
   <title>SR 5/US 1 at Marlin Rd</title>
   <dc:date>2011-10-24</dc:date>
   <guid>138</guid>
  </item>
  <item>
   <description>&lt;p&gt;&#10;&#9;Construction includes &lt;span data-scayt_word=&quot;repaving&quot; data-scaytid=&quot;1&quot;&gt;repaving&lt;/span&gt; and &lt;span data-scayt_word=&quot;restriping&quot; data-scaytid=&quot;2&quot;&gt;restriping&lt;/span&gt; the roadway; narrowing sections of the center median along the roadway to provide a wider outside lane to accommodate bicycle access; installing sections of new sidewalk and pedestrian ramps; replacing curb and gutter at various locations throughout the center median; installing several drainage structures; &lt;span data-scayt_word=&quot;signalization&quot; data-scaytid=&quot;3&quot;&gt;signalization&lt;/span&gt; enhancements; leveling several existing driveways to match the roadway; removing trees along the roadway that violate safety standards; updating the signage and pavement markings; and including adding Share the Road signs for bicyclists.&lt;/p&gt;&#10;</description>
   <link>http://www.fdotmiamidade.com/current-projects/south-miami-dade/sr-986sunset-drsw-72-st-from-sw-84-pl-to-sw-69-ave.html</link>
   <title>SR 986/Sunset Dr/SW 72 St from SW 84 Pl to SW 69 Ave</title>
   <dc:date>2011-10-17</dc:date>
   <guid>129</guid>
  </item>
  <item>
   <description>&lt;p&gt;&#10;&#9;The project includes rebuilding the roadway; widening sections of the roadway; widening the bridge over the C-103 canal; restoring the C-103 canal banks; installing median traffic separators at various locations; installing a water main across the C-103 canal; installing new sidewalks and driveways; leveling existing sidewalks and driveways to match the roadway; installing curb and gutter; upgrading lighting, traffic and pedestrian signals; and &lt;span class=&quot;scayt-misspell&quot; data-scayt_word=&quot;repaving&quot; data-scaytid=&quot;1&quot;&gt;repaving&lt;/span&gt; and &lt;span class=&quot;scayt-misspell&quot; data-scayt_word=&quot;restriping&quot; data-scaytid=&quot;3&quot;&gt;restriping&lt;/span&gt; the roadway.&lt;/p&gt;&#10;</description>
   <link>http://www.fdotmiamidade.com/current-projects/south-miami-dade/sr-5south-dixie-hwyus-1-from-sw-284-st-to-sw-304-st.html</link>
   <title>SR 5/South Dixie Hwy/US 1 from SW 284 St to SW 304 St</title>
   <dc:date>2011-02-01</dc:date>
   <guid>83</guid>
  </item>
  <item>
   <description>&lt;p&gt;&#13;&#10;&#9;&lt;img alt=&quot;&quot; src=&quot;/userfiles/images/sign.jpg&quot; style=&quot;width: 78px; height: 78px; margin: 5px; float: right;&quot; /&gt;The project will reconstruct the existing two-lane roadway to include: the addition of a 40&amp;#39; span wildlife crossing; the construction of a 6&amp;#39; x 10&amp;#39; box culvert structure to serve as wildlife crossing; the installation of eight 24&amp;quot; cross drain equalizer pipes to restore water flow to the natural wetland areas; the installation of a median barrier wall; six-foot inside shoulders, north and southbound 12-foot travel lanes, a northbound 12-foot shoulder (10-foot paved, two-foot unpaved), a southbound 10-foot shoulder (six-foot paved, four-foot unpaved); and, one-mile passing lanes at MM 121 to MM 122.&lt;/p&gt;&#13;&#10;</description>
   <link>http://www.fdotmiamidade.com/current-projects/south-miami-dade/sr-5us1-from-mile-marker-121.75-to-mile-marker-124.5.html</link>
   <title>SR 5/US1 from Mile Marker 121.75 to Mile Marker 124.5</title>
   <dc:date>2009-09-01</dc:date>
   <guid>56</guid>
  </item>
  <item>
   <description>&lt;p&gt;&#10;&#9;These projects include: repaving&amp;nbsp;and restriping Bird Road between SW 73 Avenue and SW 71 Avenue and between SW 70 Avenue and SW 69 Avenue;&amp;nbsp;replacing existing storm water drainage; extending the left-turn lanes from eastbound Bird Road to northbound SW 72 Avenue and to northbound SW 69 Avenue; replacing sidewalks, curb and gutter and pedestrian ramps; replacing traffic signals, railroad signals and crossing gates at the CSX Railroad crossing just west of SW 72 Avenue; and upgrading street lights on Bird Road.&amp;nbsp;&lt;/p&gt;&#10;</description>
   <link>http://www.fdotmiamidade.com/current-projects/south-miami-dade/sr-976sw-40-stbird-rd-from-sw-73-ave-to-sw-71-ave-and-sw-70-ave-to-sw-69-ave-.html</link>
   <title>SR 976/SW 40 St/Bird Rd from SW 73 Ave to SW 71 Ave and SW 70 Ave to SW 69 Ave </title>
   <dc:date>2011-06-13</dc:date>
   <guid>112</guid>
  </item>
  <item>
   <description>&lt;p&gt;&#10;&#9;Construction includes repairing the existing concrete pavement and improving the riding surface of the road; installing a new pump station between SE 12 Street and SE 13 Street to improve the roadway&amp;rsquo;s drainage between SE 14 Street to just south of SE 12 Street; installing a new water main and sewer lines to improve the existing system as part of a joint participation agreement with the Miami-Dade Water and Sewer Department; repairing the sidewalk and curb and gutter as needed; &lt;span class=&quot;scayt-misspell&quot; data-scayt_word=&quot;repaving&quot; data-scaytid=&quot;1&quot;&gt;repaving&lt;/span&gt; and &lt;span class=&quot;scayt-misspell&quot; data-scayt_word=&quot;restriping&quot; data-scaytid=&quot;3&quot;&gt;restriping&lt;/span&gt; the existing asphalt pavement from just north of SE 10 Street to SE 5 Street; adding left turn lanes along SE 15 Road at the intersection &lt;span class=&quot;scayt-misspell&quot; data-scayt_word=&quot;Brickell&quot; data-scaytid=&quot;5&quot;&gt;Brickell&lt;/span&gt; Avenue &amp;ndash; there will also be new traffic signals at this location; upgrading existing street lights from SE 15 Road to SE 5 Street; installing new signing and pavement markings throughout the project, including adding share the road markings for cyclists; upgrading several pedestrian ramps; installing new decorative pedestrian crosswalks at several intersections; and adding a new &lt;span class=&quot;scayt-misspell&quot; data-scayt_word=&quot;unsignalized&quot; data-scaytid=&quot;7&quot;&gt;unsignalized&lt;/span&gt; crosswalk at SE 14 Terrace and completing the crossings at SE 13 Street, SE 10 Street and SE 8 Street.&lt;/p&gt;&#10;</description>
   <link>http://www.fdotmiamidade.com/current-projects/south-miami-dade/sr-5brickell-aveus-1-from-se-25-rd-to-se-5-st.html</link>
   <title>SR 5/Brickell Ave/US 1 from SE 25 Rd to SE 5 St</title>
   <dc:date>2011-01-01</dc:date>
   <guid>73</guid>
  </item>
  <item>
   <description>&lt;p&gt;&#10;&#9;This roadway construction project will consist of the following: &lt;span class=&quot;scayt-misspell&quot; data-scayt_word=&quot;Repaving&quot; data-scaytid=&quot;1&quot;&gt;Repaving&lt;/span&gt; and &lt;span class=&quot;scayt-misspell&quot; data-scayt_word=&quot;restriping&quot; data-scaytid=&quot;3&quot;&gt;restriping&lt;/span&gt; SW 57 Avenue from SW 24 Street to SW 8 Street; Constructing new sidewalks along both the west side and east side of SW 57 Avenue; Installing curb and gutter on the west side of SW 57 Avenue; Adding bicycle lanes going northbound and southbound on SW 57 Avenue; Removing trees that conflict with the installation of new drainage structures throughout the project; Installing new traffic signals at the SW 24 Street intersection; Lengthening the existing turn lanes and creating a left-turn only lane at the SW 8 Street intersection for traffic turning from northbound SW 57 Avenue to westbound SW 8 Street; Increasing the lengths of the right and left turn lanes for southbound traffic on SW 57 Avenue to turn onto SW 24 Street; Installing new trees on the east side of SW 57 Avenue.&lt;/p&gt;&#10;</description>
   <link>http://www.fdotmiamidade.com/current-projects/south-miami-dade/sr-959sw-57-ave-from-sw-24-st-to-sw-8-st-1.html</link>
   <title>SR 959/SW 57 Ave from SW 24 St to SW 8 St</title>
   <dc:date>2012-05-21</dc:date>
   <guid>178</guid>
  </item>
 </channel>
</rss>
