<?xml version="1.0" encoding="utf-8"?>
<?xml-stylesheet type="text/xsl" href="http://www.fdotmiamidade.com/rss/rss2html.xsl"?>
<!-- Developed by K2B solution -->
<rss version="2.0" xmlns:dc="http://purl.org/dc/elements/1.1/">
 <channel>
  <description/>
  <link>http://www.fdotmiamidade.com/</link>
  <title>FLORIDA DEPARTMENT OF TRANSPORTATION: DISTRICT 6</title>
  <dc:date>2002-05-06</dc:date>
  <image>
   <url/>
   <link>http://www.fdotmiamidade.com/</link>
   <title>FLORIDA DEPARTMENT OF TRANSPORTATION: DISTRICT 6</title>
   <description>To subscribe just copy and paste the URL of this page into your RSS reader</description>
  </image>
  <item>
   <description/>
   <link/>
   <title>Category :Expressways</title>
   <guid>5</guid>
  </item>
  <item>
   <description>&lt;p&gt;&#10;&#9;As part of the overall improvement program for&amp;nbsp;State Road (SR) 826/Palmetto Expressway, The Florida Department of Transportation (&lt;span class=&quot;scayt-misspell&quot; data-scayt_word=&quot;FDOT&quot; data-scaytid=&quot;3&quot;&gt;FDOT&lt;/span&gt;), District 6, is widening&amp;nbsp;the Palmetto Expressway from just north of&amp;nbsp;&amp;nbsp;SW &lt;span class=&quot;scayt-misspell&quot; data-scayt_word=&quot;40th&quot; data-scaytid=&quot;9&quot;&gt;40th&lt;/span&gt; Street / Bird Road to south of SW &lt;span class=&quot;scayt-misspell&quot; data-scayt_word=&quot;56th&quot; data-scaytid=&quot;11&quot;&gt;56th&lt;/span&gt; Street / Miller Drive. This&amp;nbsp;is one of several widening&amp;nbsp;projects slated for the Palmetto Expressway designed to improve&amp;nbsp;safety and traffic flow through the area.&amp;nbsp;This project includes the following:&lt;/p&gt;&#10;&lt;ul class=&quot;list&quot;&gt;&#10;&#9;&lt;li&gt;&#10;&#9;&#9;Adding one new travel lane in each direction on&amp;nbsp;the Palmetto Expressway;&lt;br /&gt;&#10;&#9;&#9;&amp;nbsp;&lt;/li&gt;&#10;&#9;&lt;li&gt;&#10;&#9;&#9;Adding&amp;nbsp;one new eastbound lane on&amp;nbsp;Bird Road&amp;nbsp;from&amp;nbsp;Tropical Park to just east of the Palmetto Expressway;&lt;br /&gt;&#10;&#9;&#9;&amp;nbsp;&lt;/li&gt;&#10;&#9;&lt;li&gt;&#10;&#9;&#9;Rebuilding&amp;nbsp;entrance&amp;nbsp;and&amp;nbsp;exit&amp;nbsp;ramps&amp;nbsp;to and from the Palmetto Expressway at Bird Rd., Miller Dr., and SR 874;&lt;br /&gt;&#10;&#9;&#9;&amp;nbsp;&lt;/li&gt;&#10;&#9;&lt;li&gt;&#10;&#9;&#9;Rebuilding&amp;nbsp;bridges over Miller Dr., Bird Rd., and SR 874;&lt;br /&gt;&#10;&#9;&#9;&amp;nbsp;&lt;/li&gt;&#10;&#9;&lt;li&gt;&#10;&#9;&#9;Building&amp;nbsp;new pedestrian bridge&amp;nbsp;over the Palmetto Expressway just&amp;nbsp;north of Bird Rd.;&lt;br /&gt;&#10;&#9;&#9;&amp;nbsp;&lt;/li&gt;&#10;&#9;&lt;li&gt;&#10;&#9;&#9;Installing&amp;nbsp;new 8&amp;rdquo; water mains&amp;nbsp;at various locations in coordination with Miami-Dade Water and Sewer&lt;br /&gt;&#10;&#9;&#9;&amp;nbsp;&lt;/li&gt;&#10;&#9;&lt;li&gt;&#10;&#9;&#9;Building&amp;nbsp;a new storm water drainage system throughout the project area;&lt;br /&gt;&#10;&#9;&#9;&amp;nbsp;&lt;/li&gt;&#10;&#9;&lt;li&gt;&#10;&#9;&#9;Installing Intelligent Transportation System (ITS)&amp;nbsp;equipment&amp;nbsp;throughout the&amp;nbsp;project;&lt;br /&gt;&#10;&#9;&#9;&amp;nbsp;&lt;/li&gt;&#10;&#9;&lt;li&gt;&#10;&#9;&#9;Installing&amp;nbsp;new street signs,&amp;nbsp;new street lights and&amp;nbsp;traffic signals; and&lt;br /&gt;&#10;&#9;&#9;&amp;nbsp;&lt;/li&gt;&#10;&#9;&lt;li&gt;&#10;&#9;&#9;Installing new&amp;nbsp;landscaping along the project limits.&lt;/li&gt;&#10;&lt;/ul&gt;&#10;</description>
   <link>http://www.fdotmiamidade.com/current-projects/expressways/sr-826palmetto-expwy-from-north-of-sw-40-st-to-south-of-sw-56-st.html</link>
   <title>SR 826/Palmetto Expwy from north of SW 40 St to south of SW 56 St</title>
   <dc:date>2008-11-18</dc:date>
   <guid>29</guid>
  </item>
  <item>
   <description>&lt;p&gt;&#10;&#9;Construction includes planting a mix of large and small plants along the Palmetto Expressway at the following locations:&lt;/p&gt;&#10;&lt;ul&gt;&#10;&#9;&lt;li&gt;&#10;&#9;&#9;Along&amp;nbsp;the north and south sides of the Palmetto Expressway between NW&amp;nbsp;22 Avenue and NW&amp;nbsp;19 Avenue and from NW 18 Avenue to NW 17 Avenue&lt;/li&gt;&#10;&#9;&lt;li&gt;&#10;&#9;&#9;Along the north side of the Palmetto Expressway&amp;nbsp;between NW 16 Avenue to just before NW 15 Avenue, from NW 15 Avenue to the bridge at NW 13 Avenue/NW 12 Avenue, after&amp;nbsp;the bridge at NW 13 Avenue/NW 12 Avenue to NW 10 Court,&amp;nbsp;and from NW 9 Court to&amp;nbsp;NW 8 Avenue&lt;/li&gt;&#10;&lt;/ul&gt;&#10;</description>
   <link>http://www.fdotmiamidade.com/current-projects/expressways/sr-826palmetto-expwy-from-nw-22-ave-to-nw-8-ave.html</link>
   <title>SR 826/Palmetto Expwy from NW 22 Ave to NW 8 Ave</title>
   <dc:date>2012-01-17</dc:date>
   <guid>161</guid>
  </item>
  <item>
   <description>&lt;p&gt;&#10;&#9;&lt;img alt=&quot;&quot; src=&quot;/userfiles/images/srSign9A.jpg&quot; style=&quot;float: right; margin: 2px; width: 78px; height: 78px&quot; /&gt;The intent of this project is to enhance the area by: restoring various bridge components; rehabilitating the bridge&amp;rsquo;s joints; cleaning the bridge&amp;rsquo;s drainage system; and painting the bridge.&lt;/p&gt;&#10;</description>
   <link>http://www.fdotmiamidade.com/current-projects/expressways/sr-9i-95-from-sw-8-st-to-nw-8-st.html</link>
   <title>SR 9/I-95 from SW 8 St to NW 8 St</title>
   <dc:date>2009-11-01</dc:date>
   <guid>35</guid>
  </item>
  <item>
   <description>&lt;p&gt;&#10;&#9;&lt;span style=&quot;color: #ff0000&quot;&gt;&lt;span style=&quot;font-size: 14px&quot;&gt;&lt;strong&gt;UPDATE: Start date is March&amp;nbsp;19, 2012&lt;/strong&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;&#10;&lt;p&gt;&#10;&#9;&amp;nbsp;&lt;/p&gt;&#10;&lt;p&gt;&#10;&#9;This landscaping project will consist of removing all invasive plants at the interchange of SR &lt;span class=&quot;scayt-misspell&quot; data-scayt_word=&quot;9A&quot; data-scaytid=&quot;1&quot;&gt;9A&lt;/span&gt;/I-95 and SR 112. We will be installing a mix of large and small plants throughout the interchange.&lt;/p&gt;&#10;</description>
   <link>http://www.fdotmiamidade.com/current-projects/expressways/i-95-from-nw-32-st-to-nw-47-terr.html</link>
   <title>I-95 from NW 32 St to NW 47 Terr</title>
   <dc:date>2012-03-19</dc:date>
   <guid>162</guid>
  </item>
  <item>
   <description>&lt;p&gt;&#10;&#9;This project includes replacing sections of sidewalk; curb and gutter, and pedestrian ramps; partially rebuilding a small section of roadway; leveling several driveways to match the roadway; installing trench drains and several underground drainage structures; updating &lt;span data-scayt_word=&quot;signalization&quot; data-scaytid=&quot;1&quot;&gt;signalization&lt;/span&gt;; adding a bicycle lane; &lt;span data-scayt_word=&quot;repaving&quot; data-scaytid=&quot;2&quot;&gt;repaving&lt;/span&gt; and &lt;span data-scayt_word=&quot;restriping&quot; data-scaytid=&quot;3&quot;&gt;restriping&lt;/span&gt; the roadway; placing decorative pavement at crosswalks; updating signage and pavement markings; and eliminating nine parking spaces between 75 Street and 69 Street.&lt;/p&gt;&#10;</description>
   <link>http://www.fdotmiamidade.com/current-projects/expressways/sr-a1aharding-ave-from-indian-creek-dr-to-south-of-75-st-1.html</link>
   <title>SR A1A/Harding Ave from Indian Creek Dr to south of 75 St</title>
   <dc:date>2012-04-09</dc:date>
   <guid>173</guid>
  </item>
  <item>
   <description>&lt;p class=&quot;regulartext&quot;&gt;&#10;&#9;&lt;img alt=&quot;&quot; src=&quot;/userfiles/images/srSign112.jpg&quot; style=&quot;margin: 5px; width: 78px; float: right; height: 78px&quot; /&gt;Construction includes replacing the curb and guardrail in the median with a concrete barrier wall; widening the bridges, upgrading the bridge railings and adding barrier wall along the roadway; widening the roadway at several locations; building a retaining wall system; adding eastbound and westbound auxiliary lanes from I-95 to North Miami Avenue; rebuilding the North Miami Avenue exit ramp; replacing sections of the communications system (ITS); installing new signs and traffic signals; relocating and adding landscaping; and improving the riding surface of the road.&lt;/p&gt;&#10;</description>
   <link>http://www.fdotmiamidade.com/current-projects/expressways/sr-112i-195-from-nw-10-ave-to-biscayne-bay.html</link>
   <title>SR 112/I-195 from NW 10 Ave to Biscayne Bay</title>
   <dc:date>2010-11-01</dc:date>
   <guid>68</guid>
  </item>
  <item>
   <description>&lt;p&gt;&#10;&#9;Capacity improvements include the reconstruction and widening along both SR 826 and SR 836, the construction of a four-level interchange as well as the reconstruction/modifications of the Flagler Street/ SR 826 and the Milam Dairy Road/NW 72 Avenue/SR 836 interchanges.&lt;/p&gt;&#10;&lt;p style=&quot;text-align: center&quot;&gt;&#10;&#9;&lt;a href=&quot;http://www.826-836.com&quot; target=&quot;_blank&quot;&gt;&lt;img alt=&quot;Click here to visit the 826/836 Interchange Reconstruction Website, www.826-836.com&quot; src=&quot;/userfiles/images/visit-button-bl3.png&quot; style=&quot;border-bottom: 0px solid; border-left: 0px solid; width: 249px; height: 54px; border-top: 0px solid; border-right: 0px solid&quot; /&gt;&lt;/a&gt;&lt;/p&gt;&#10;</description>
   <link>http://www.fdotmiamidade.com/current-projects/expressways/sr-826836-interchange-reconstruction.html</link>
   <title>SR 826/836 Interchange Reconstruction</title>
   <dc:date>2009-11-01</dc:date>
   <guid>70</guid>
  </item>
  <item>
   <description>&lt;p&gt;&#10;&#9;The Design/Build project included building two High Occupancy Toll (HOT) lanes on I-95 in place of the existing High Occupancy Vehicle Lanes (HOV).&amp;nbsp; Open Road Tolling (ORT) and various Intelligent Transportation System (ITS) components were included in this project.&amp;nbsp; 95 Express will be extended to I-595 in &lt;strong&gt;Broward County,&amp;nbsp;which began&amp;nbsp;on November&amp;nbsp;28,&amp;nbsp;2011&lt;/strong&gt;.&lt;/p&gt;&#10;&lt;p style=&quot;text-align: center&quot;&gt;&#10;&#9;&lt;a href=&quot;http://www.95express.com&quot; target=&quot;_blank&quot;&gt;&lt;img alt=&quot;Click Here to visit the 95Express.com web site. &quot; src=&quot;/userfiles/images/visit-button-bl3.png&quot; style=&quot;border-bottom: 0px solid; border-left: 0px solid; width: 249px; height: 54px; border-top: 0px solid; border-right: 0px solid&quot; /&gt;&lt;/a&gt;&lt;/p&gt;&#10;</description>
   <link>http://www.fdotmiamidade.com/current-projects/expressways/95-express.html</link>
   <title>95 Express</title>
   <dc:date>2010-11-01</dc:date>
   <guid>71</guid>
  </item>
  <item>
   <description>&lt;p&gt;&#10;&#9;This project consists of the installing landscaping between NW 81 Street to NW 99 Street, including the Okeechobee Road Interchange.&lt;/p&gt;&#10;</description>
   <link>http://www.fdotmiamidade.com/current-projects/expressways/sr-826palmetto-expwy-from-nw-81-st-to-nw-99-st-.html</link>
   <title>SR 826/Palmetto Expwy from NW 81 St to NW 99 St </title>
   <dc:date>2010-11-01</dc:date>
   <guid>76</guid>
  </item>
  <item>
   <description>&lt;p&gt;&#10;&#9;Construction includes planting a mix of large and small plants along the Palmetto Expressway at the following locations:&lt;/p&gt;&#10;&lt;ul&gt;&#10;&#9;&lt;li&gt;&#10;&#9;&#9;Along the northbound and southbound entrance and exit ramps of&amp;nbsp;the Palmetto Expressway interchange at Coral Way&lt;/li&gt;&#10;&#9;&lt;li&gt;&#10;&#9;&#9;Along the west side of&amp;nbsp;the Palmetto Expressway behind the existing noise wall between SW 32 Street and SW&amp;nbsp;28 Street, at SW 19 Street and between SW 17&amp;nbsp;Terrace and SW&amp;nbsp;17&amp;nbsp;Street&lt;/li&gt;&#10;&#9;&lt;li&gt;&#10;&#9;&#9;At the center median on Coral Way, just east of the&amp;nbsp;Palmetto&amp;nbsp;Expressway&lt;/li&gt;&#10;&lt;/ul&gt;&#10;</description>
   <link>http://www.fdotmiamidade.com/current-projects/expressways/sr-826palmetto-expwy-from-sw-32-st-to-sw-16-st.html</link>
   <title>SR 826/Palmetto Expwy from SW 32 St to SW 16 St</title>
   <dc:date>2012-01-17</dc:date>
   <guid>158</guid>
  </item>
  <item>
   <description>&lt;p&gt;&#10;&#9;&lt;span style=&quot;font-size: 12px&quot;&gt;On Monday, January 9, the Florida Department of Transportation (&lt;span class=&quot;scayt-misspell&quot; data-scayt_word=&quot;FDOT&quot; data-scaytid=&quot;1&quot;&gt;FDOT&lt;/span&gt;) will start a roadway project&amp;nbsp;at NW 87 Avenue (W 28&amp;nbsp;Avenue)&amp;nbsp;on State Road (SR) 93/I-75 to NW 103 Street along southbound SR 826/Palmetto&amp;nbsp;Expressway. This project will last about 420 days&amp;nbsp;and cost an estimated $6.7 million.&lt;/span&gt;&lt;/p&gt;&#10;&lt;p&gt;&#10;&#9;&lt;span style=&quot;font-size: 12px&quot;&gt;This Project Includes:&lt;/span&gt;&lt;/p&gt;&#10;&lt;ul&gt;&#10;&#9;&lt;li&gt;&#10;&#9;&#9;&lt;span style=&quot;font-size: 12px&quot;&gt;Adding an&amp;nbsp;extra lane on the eastbound SR&amp;nbsp;93/I-75 exit ramp&lt;/span&gt;&lt;/li&gt;&#10;&#9;&lt;li&gt;&#10;&#9;&#9;&lt;span style=&quot;font-size: 12px&quot;&gt;Adding an extra lane on southbound SR&amp;nbsp;826 between the exit ramp on SR 93/I-75&amp;nbsp;and NW 103 Street&lt;/span&gt;&lt;/li&gt;&#10;&#9;&lt;li&gt;&#10;&#9;&#9;&lt;span style=&quot;font-size: 12px&quot;&gt;&lt;span class=&quot;scayt-ignore&quot; data-scayt_word=&quot;Repaving&quot; data-scaytid=&quot;3&quot;&gt;Repaving&lt;/span&gt; the exit ramps&lt;/span&gt;&lt;/li&gt;&#10;&#9;&lt;li&gt;&#10;&#9;&#9;&lt;span style=&quot;font-size: 12px&quot;&gt;Installing new signage&lt;/span&gt;&lt;/li&gt;&#10;&#9;&lt;li&gt;&#10;&#9;&#9;&lt;span style=&quot;font-size: 12px&quot;&gt;Upgrading drainage system and lighting&lt;/span&gt;&lt;/li&gt;&#10;&#9;&lt;li&gt;&#10;&#9;&#9;&lt;span style=&quot;font-size: 12px&quot;&gt;Minor landscaping changes&lt;/span&gt;&lt;/li&gt;&#10;&lt;/ul&gt;&#10;</description>
   <link>http://www.fdotmiamidade.com/current-projects/expressways/sr-826palmetto-expwy-from-i-75-to-nw-103-st.html</link>
   <title>SR 826/Palmetto Expwy from I-75 to NW 103 St</title>
   <dc:date>2012-01-09</dc:date>
   <guid>159</guid>
  </item>
  <item>
   <description>&lt;p&gt;&#10;&#9;This project includes replacing sections of sidewalk; curb and gutter, and pedestrian ramps; partially rebuilding a small section of roadway; leveling several driveways to match the roadway; installing trench drains and several underground drainage structures; updating &lt;span data-scayt_word=&quot;signalization&quot; data-scaytid=&quot;1&quot;&gt;signalization&lt;/span&gt;; adding a bicycle lane; &lt;span data-scayt_word=&quot;repaving&quot; data-scaytid=&quot;2&quot;&gt;repaving&lt;/span&gt; and &lt;span data-scayt_word=&quot;restriping&quot; data-scaytid=&quot;3&quot;&gt;restriping&lt;/span&gt; the roadway; placing decorative pavement at crosswalks; updating signage and pavement markings; and eliminating nine parking spaces between 75 Street and 69 Street.&lt;/p&gt;&#10;</description>
   <link>http://www.fdotmiamidade.com/current-projects/expressways/sr-a1aharding-ave-from-indian-creek-dr-to-south-of-75-st.html</link>
   <title>SR A1A/Harding Ave from Indian Creek Dr to south of 75 St</title>
   <dc:date>2012-04-09</dc:date>
   <guid>172</guid>
  </item>
  <item>
   <description>&lt;p&gt;&#10;&#9;This project includes adding an extra lane on westbound SR 826 between the exit ramps on NW 67 Avenue and NW 47 Avenue; adding a second lane at the westbound off-ramps at NW 67 Avenue and NW 57 Avenue; &lt;span class=&quot;scayt-misspell&quot; data-scayt_word=&quot;repaving&quot; data-scaytid=&quot;1&quot;&gt;repaving&lt;/span&gt; the exit ramps and frontage roads; installing a new electronic message sign board; upgrading drainage system and upgrading lighting and signage.&lt;/p&gt;&#10;</description>
   <link>http://www.fdotmiamidade.com/current-projects/expressways/sr-826palmetto-expwy-from-nw-67-ave-to-nw-47-ave.html</link>
   <title>SR 826/Palmetto Expwy from NW 67 Ave to NW 47 Ave</title>
   <dc:date>2011-09-12</dc:date>
   <guid>134</guid>
  </item>
  <item>
   <description>&lt;p&gt;&#10;&#9;This project includes widening&amp;nbsp;the median areas on&amp;nbsp;Ives Dairy Road and&amp;nbsp;the entrance and exit ramps to/from&amp;nbsp;I-95 to&amp;nbsp;ease traffic&amp;nbsp;flow through this area.&amp;nbsp;&lt;/p&gt;&#10;</description>
   <link>http://www.fdotmiamidade.com/current-projects/expressways/i-95ives-dairy-rd-interchange.html</link>
   <title>I-95/Ives Dairy Rd Interchange</title>
   <dc:date>2012-02-01</dc:date>
   <guid>166</guid>
  </item>
  <item>
   <description>&lt;p&gt;&#10;&#9;Construction includes&amp;nbsp;planting a mix of large and small&amp;nbsp;plants&amp;nbsp;along the Palmetto&amp;nbsp;Expressway at the following locations:&lt;/p&gt;&#10;&lt;ul&gt;&#10;&#9;&lt;li&gt;&#10;&#9;&#9;Along the northbound and southbound entrance and exit ramps of the Palmetto Expressway interchange at&amp;nbsp;NW 74 Street&lt;/li&gt;&#10;&#9;&lt;li&gt;&#10;&#9;&#9;Along the east and west sides of the Palmetto Expressway&amp;nbsp;between NW&amp;nbsp;66 Street to NW 71 Street, and&amp;nbsp;from north&amp;nbsp;of the &lt;span class=&quot;scayt-misspell&quot; data-scayt_word=&quot;Metrorail&quot; data-scaytid=&quot;1&quot;&gt;Metrorail&lt;/span&gt; to NW 81 Street&lt;/li&gt;&#10;&#9;&lt;li&gt;&#10;&#9;&#9;At the center median on NW 74 Street, just east of the Palmetto&amp;nbsp;Expressway&lt;/li&gt;&#10;&lt;/ul&gt;&#10;</description>
   <link>http://www.fdotmiamidade.com/current-projects/expressways/sr-826palmetto-expwy-from-nw-62-st-to-nw-81-st.html</link>
   <title>SR 826/Palmetto Expwy from NW 62 St to NW 81 St</title>
   <dc:date>2012-01-03</dc:date>
   <guid>157</guid>
  </item>
  <item>
   <description>&lt;p&gt;&#10;&#9;This project will&amp;nbsp;extend the&amp;nbsp;existing express lanes north from Miami&amp;nbsp;Gardens Drive to Broward&amp;nbsp;Boulevard in Broward County by converting&amp;nbsp;the existing High Occupancy Vehicle Lanes&amp;nbsp;to two express lanes&amp;nbsp;in each direction. Other work includes&amp;nbsp;installing Intelligent Transportation System (ITS) components;&amp;nbsp;modifying the Ives Dairy Road Interchange, bridge widening at specific locations and installing noise walls at specific locations between Hollywood Boulevard&amp;nbsp;and&amp;nbsp;Taft Street. &amp;nbsp;&lt;/p&gt;&#10;</description>
   <link>http://www.fdotmiamidade.com/current-projects/expressways/95-express-phase-2.html</link>
   <title>95 Express Phase 2</title>
   <dc:date>2011-11-28</dc:date>
   <guid>167</guid>
  </item>
 </channel>
</rss>
