<?xml version="1.0" encoding="utf-8"?>
<?xml-stylesheet type="text/xsl" href="http://www.fdotmiamidade.com/rss/rss2html.xsl"?>
<!-- Developed by K2B solution -->
<rss version="2.0" xmlns:dc="http://purl.org/dc/elements/1.1/">
 <channel>
  <description/>
  <link>http://www.fdotmiamidade.com/</link>
  <title>FLORIDA DEPARTMENT OF TRANSPORTATION: DISTRICT 6</title>
  <dc:date>2002-05-06</dc:date>
  <image>
   <url/>
   <link>http://www.fdotmiamidade.com/</link>
   <title>FLORIDA DEPARTMENT OF TRANSPORTATION: DISTRICT 6</title>
   <description>To subscribe just copy and paste the URL of this page into your RSS reader</description>
  </image>
  <item>
   <description/>
   <link/>
   <title>Category :Expressways</title>
   <guid>5</guid>
  </item>
  <item>
   <description>&lt;p&gt;&#10;&#9;As part of the overall improvement program for&amp;nbsp;State Road (SR) 826/Palmetto Expressway, The Florida Department of Transportation (&lt;span class=&quot;scayt-misspell&quot; data-scayt_word=&quot;FDOT&quot; data-scaytid=&quot;3&quot;&gt;FDOT&lt;/span&gt;), District 6, is widening&amp;nbsp;the Palmetto Expressway from just north of&amp;nbsp;&amp;nbsp;SW &lt;span class=&quot;scayt-misspell&quot; data-scayt_word=&quot;40th&quot; data-scaytid=&quot;9&quot;&gt;40th&lt;/span&gt; Street / Bird Road to south of SW &lt;span class=&quot;scayt-misspell&quot; data-scayt_word=&quot;56th&quot; data-scaytid=&quot;11&quot;&gt;56th&lt;/span&gt; Street / Miller Drive. This&amp;nbsp;is one of several widening&amp;nbsp;projects slated for the Palmetto Expressway designed to improve&amp;nbsp;safety and traffic flow through the area.&amp;nbsp;This project includes the following:&lt;/p&gt;&#10;&lt;ul class=&quot;list&quot;&gt;&#10;&#9;&lt;li&gt;&#10;&#9;&#9;Adding one new travel lane in each direction on&amp;nbsp;the Palmetto Expressway;&lt;br /&gt;&#10;&#9;&#9;&amp;nbsp;&lt;/li&gt;&#10;&#9;&lt;li&gt;&#10;&#9;&#9;Adding&amp;nbsp;one new eastbound lane on&amp;nbsp;Bird Road&amp;nbsp;from&amp;nbsp;Tropical Park to just east of the Palmetto Expressway;&lt;br /&gt;&#10;&#9;&#9;&amp;nbsp;&lt;/li&gt;&#10;&#9;&lt;li&gt;&#10;&#9;&#9;Rebuilding&amp;nbsp;entrance&amp;nbsp;and&amp;nbsp;exit&amp;nbsp;ramps&amp;nbsp;to and from the Palmetto Expressway at Bird Rd., Miller Dr., and SR 874;&lt;br /&gt;&#10;&#9;&#9;&amp;nbsp;&lt;/li&gt;&#10;&#9;&lt;li&gt;&#10;&#9;&#9;Rebuilding&amp;nbsp;bridges over Miller Dr., Bird Rd., and SR 874;&lt;br /&gt;&#10;&#9;&#9;&amp;nbsp;&lt;/li&gt;&#10;&#9;&lt;li&gt;&#10;&#9;&#9;Building&amp;nbsp;new pedestrian bridge&amp;nbsp;over the Palmetto Expressway just&amp;nbsp;north of Bird Rd.;&lt;br /&gt;&#10;&#9;&#9;&amp;nbsp;&lt;/li&gt;&#10;&#9;&lt;li&gt;&#10;&#9;&#9;Installing&amp;nbsp;new 8&amp;rdquo; water mains&amp;nbsp;at various locations in coordination with Miami-Dade Water and Sewer&lt;br /&gt;&#10;&#9;&#9;&amp;nbsp;&lt;/li&gt;&#10;&#9;&lt;li&gt;&#10;&#9;&#9;Building&amp;nbsp;a new storm water drainage system throughout the project area;&lt;br /&gt;&#10;&#9;&#9;&amp;nbsp;&lt;/li&gt;&#10;&#9;&lt;li&gt;&#10;&#9;&#9;Installing Intelligent Transportation System (ITS)&amp;nbsp;equipment&amp;nbsp;throughout the&amp;nbsp;project;&lt;br /&gt;&#10;&#9;&#9;&amp;nbsp;&lt;/li&gt;&#10;&#9;&lt;li&gt;&#10;&#9;&#9;Installing&amp;nbsp;new street signs,&amp;nbsp;new street lights and&amp;nbsp;traffic signals; and&lt;br /&gt;&#10;&#9;&#9;&amp;nbsp;&lt;/li&gt;&#10;&#9;&lt;li&gt;&#10;&#9;&#9;Installing new&amp;nbsp;landscaping along the project limits.&lt;/li&gt;&#10;&lt;/ul&gt;&#10;</description>
   <link>http://www.fdotmiamidade.com/current-projects/expressways/sr-826palmetto-expwy-from-north-of-sw-40-st-to-south-of-sw-56-st.html</link>
   <title>SR 826/Palmetto Expwy from north of SW 40 St to south of SW 56 St</title>
   <dc:date>2008-11-18</dc:date>
   <guid>29</guid>
  </item>
  <item>
   <description>&lt;p&gt;&#10;&#9;Construction includes repairing the concrete and steel on the bridge and painting the bridge.&lt;/p&gt;&#10;</description>
   <link>http://www.fdotmiamidade.com/current-projects/expressways/sr-9ai-95-exit-ramp-to-floridas-turnpike-1.html</link>
   <title>SR 9A/I-95 exit ramp to Florida&amp;#039;s Turnpike</title>
   <dc:date>2012-10-08</dc:date>
   <guid>203</guid>
  </item>
  <item>
   <description>&lt;p&gt;&#10;&#9;&lt;span style=&quot;color: rgb(255, 0, 0);&quot;&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;&lt;strong&gt;UPDATE: Start date is March&amp;nbsp;19, 2012&lt;/strong&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;&#10;&lt;p&gt;&#10;&#9;&amp;nbsp;&lt;/p&gt;&#10;&lt;p&gt;&#10;&#9;This landscaping project will consist of removing all invasive plants at the interchange of SR &lt;span class=&quot;scayt-misspell&quot; data-scayt_word=&quot;9A&quot; data-scaytid=&quot;1&quot;&gt;9A&lt;/span&gt;/I-95 and SR 112. We will be installing a mix of large and small plants throughout the interchange.&lt;/p&gt;&#10;</description>
   <link>http://www.fdotmiamidade.com/current-projects/expressways/i-95-from-nw-32-st-to-nw-47-terr.html</link>
   <title>SR 9A/I-95 from NW 32 St to NW 47 Terr</title>
   <dc:date>2012-03-19</dc:date>
   <guid>162</guid>
  </item>
  <item>
   <description>&lt;p&gt;&#10;&#9;This project consists of &lt;span class=&quot;scayt-misspell&quot; data-scayt_word=&quot;repaving&quot; data-scaytid=&quot;1&quot;&gt;repaving&lt;/span&gt; and &lt;span class=&quot;scayt-misspell&quot; data-scayt_word=&quot;restriping&quot; data-scaytid=&quot;3&quot;&gt;restriping&lt;/span&gt; the project roadway.&amp;nbsp;&lt;/p&gt;&#10;</description>
   <link>http://www.fdotmiamidade.com/current-projects/expressways/sr-112-wb-off-ramp-to-nw-12-ave--1.html</link>
   <title>SR 112 WB off-ramp to NW 12 Ave </title>
   <dc:date>2013-04-08</dc:date>
   <guid>229</guid>
  </item>
  <item>
   <description>&lt;p&gt;&#10;&#9;This project includes replacing sections of sidewalk; curb and gutter, and pedestrian ramps; partially rebuilding a small section of roadway; leveling several driveways to match the roadway; installing trench drains and several underground drainage structures; updating &lt;span data-scayt_word=&quot;signalization&quot; data-scaytid=&quot;1&quot;&gt;signalization&lt;/span&gt;; adding a bicycle lane; &lt;span data-scayt_word=&quot;repaving&quot; data-scaytid=&quot;2&quot;&gt;repaving&lt;/span&gt; and &lt;span data-scayt_word=&quot;restriping&quot; data-scaytid=&quot;3&quot;&gt;restriping&lt;/span&gt; the roadway; placing decorative pavement at crosswalks; updating signage and pavement markings; and eliminating nine parking spaces between 75 Street and 69 Street.&lt;/p&gt;&#10;</description>
   <link>http://www.fdotmiamidade.com/current-projects/expressways/sr-a1aharding-ave-from-indian-creek-dr-to-south-of-75-st-1.html</link>
   <title>SR A1A/Harding Ave from Indian Creek Dr to south of 75 St</title>
   <dc:date>2012-04-09</dc:date>
   <guid>173</guid>
  </item>
  <item>
   <description>&lt;p&gt;&#10;&#9;Construction includes widening the roadway and bridges in order to provide three eastbound and three westbound travel lanes; installing barrier wall along the median and outside of the roadway; building a retaining wall system; installing several drainage structures to improve storm water runoff; installing new lighting along the roadway; replacing an overhead sign structure along westbound I-395 near Biscayne Bay; &lt;span data-scayt_word=&quot;repaving&quot; data-scaytid=&quot;1&quot;&gt;repaving&lt;/span&gt; and &lt;span data-scayt_word=&quot;restriping&quot; data-scaytid=&quot;2&quot;&gt;restriping&lt;/span&gt; the westbound I-395 exit ramp to North &lt;span data-scayt_word=&quot;Bayshore&quot; data-scaytid=&quot;3&quot;&gt;Bayshore&lt;/span&gt; Drive and the eastbound I-395 entrance ramp to the MacArthur Causeway; improving the riding surface of the roadway; updating signage and pavement markings; and relocating and removing several trees.&lt;/p&gt;&#10;&lt;p&gt;&#10;&#9;To do this work safely, it will be necessary to close travel lanes and conduct detours at times. Nighttime lane closures will be:&lt;/p&gt;&#10;&lt;ul&gt;&#10;&#9;&lt;li&gt;&#10;&#9;&#9;12 a.m. Monday through 5:30 a.m. Monday&lt;/li&gt;&#10;&#9;&lt;li&gt;&#10;&#9;&#9;9 p.m. Monday through 5:30 a.m. Tuesday&lt;/li&gt;&#10;&#9;&lt;li&gt;&#10;&#9;&#9;9 p.m. Tuesday through 5:30 a.m. Wednesday&lt;/li&gt;&#10;&#9;&lt;li&gt;&#10;&#9;&#9;9 p.m. Wednesday through 5:30 a.m. Thursday&lt;/li&gt;&#10;&#9;&lt;li&gt;&#10;&#9;&#9;9 p.m. Thursday through 5:30 a.m. Friday&lt;/li&gt;&#10;&lt;/ul&gt;&#10;&lt;p&gt;&#10;&#9;Lane closures may also be performed when needed on:&lt;/p&gt;&#10;&lt;ul&gt;&#10;&#9;&lt;li&gt;&#10;&#9;&#9;1 a.m. Saturday through 9 a.m. Saturday&lt;/li&gt;&#10;&#9;&lt;li&gt;&#10;&#9;&#9;1 a.m. Sunday through 10 a.m. Sunday&lt;/li&gt;&#10;&lt;/ul&gt;&#10;&lt;p&gt;&#10;&#9;Permanent work zones, which will shift the existing travel lanes, will be established to lessen the effects of construction. Nighttime detours will be used while the contractor performs certain work along I-395, Biscayne Boulevard and North &lt;span data-scayt_word=&quot;Bayshore&quot; data-scaytid=&quot;4&quot;&gt;Bayshore&lt;/span&gt; Drive. Nighttime detours will also be used while performing work at the entrance and exit ramps of Biscayne Boulevard and North &lt;span data-scayt_word=&quot;Bayshore&quot; data-scaytid=&quot;5&quot;&gt;Bayshore&lt;/span&gt; Drive.&lt;/p&gt;&#10;</description>
   <link>http://www.fdotmiamidade.com/current-projects/expressways/sr-836i-395-from-ne-1-ave-to-biscayne-bay-1.html</link>
   <title>SR 836/I-395 from NE 1 Ave to Biscayne Bay</title>
   <dc:date>2013-01-07</dc:date>
   <guid>211</guid>
  </item>
  <item>
   <description>&lt;p&gt;&#10;&#9;Capacity improvements include the reconstruction and widening along both SR 826 and SR 836, the construction of a four-level interchange as well as the reconstruction/modifications of the Flagler Street/ SR 826 and the Milam Dairy Road/NW 72 Avenue/SR 836 interchanges.&lt;/p&gt;&#10;&lt;p style=&quot;text-align: center; &quot;&gt;&#10;&#9;&lt;embed allowfullscreen=&quot;true&quot; bgcolor=&quot;#000000&quot; flashvars=&quot;autostart=false&amp;amp;overstretch=false&amp;amp;image=http://www.826-836.com/system/images/gallery/826.png&amp;amp;width=450&amp;amp;height=400&amp;amp;volume=70&amp;amp;file=http://www.826-836.com/system/images/swfgallery/SR826-Managed-Lanes-REV4.flv&quot; height=&quot;400&quot; id=&quot;player&quot; name=&quot;player&quot; quality=&quot;high&quot; scale=&quot;default&quot; src=&quot;http://www.826-836.com/system/static/swf/dotVideo.swf&quot; style=&quot;undefined&quot; type=&quot;application/x-shockwave-flash&quot; width=&quot;450&quot; wmode=&quot;transparent&quot;&gt;&lt;/embed&gt;&lt;/p&gt;&#10;&lt;p style=&quot;text-align: center&quot;&gt;&#10;&#9;&lt;a href=&quot;http://www.826-836.com&quot; target=&quot;_blank&quot;&gt;&lt;img alt=&quot;Click here to visit the 826/836 Interchange Reconstruction Website, www.826-836.com&quot; src=&quot;/userfiles/images/visit-button-bl3.png&quot; style=&quot;border-bottom: 0px solid; border-left: 0px solid; width: 249px; height: 54px; border-top: 0px solid; border-right: 0px solid&quot; /&gt;&lt;/a&gt;&lt;/p&gt;&#10;</description>
   <link>http://www.fdotmiamidade.com/current-projects/expressways/sr-826836-interchange-reconstruction.html</link>
   <title>SR 826/836 Interchange Reconstruction</title>
   <dc:date>2009-11-01</dc:date>
   <guid>70</guid>
  </item>
  <item>
   <description>&lt;p&gt;&#10;&#9;The Design/Build project included building two High Occupancy Toll (HOT) lanes on I-95 in place of the existing High Occupancy Vehicle Lanes (&lt;span class=&quot;scayt-misspell&quot; data-scayt_word=&quot;HOV&quot; data-scaytid=&quot;1&quot;&gt;HOV&lt;/span&gt;).&amp;nbsp; Open Road Tolling (ORT) and various Intelligent Transportation System (ITS) components were included in this project.&amp;nbsp; 95 Express will be extended to I-595 in &lt;strong&gt;Broward County,&amp;nbsp;which began&amp;nbsp;on November&amp;nbsp;28,&amp;nbsp;2011&lt;/strong&gt;.&lt;/p&gt;&#10;&lt;p style=&quot;text-align: center;&quot;&gt;&#10;&#9;&lt;a href=&quot;http://www.95express.com&quot; target=&quot;_blank&quot;&gt;&lt;img alt=&quot;Click Here to visit the 95Express.com web site. &quot; src=&quot;/userfiles/images/visit-button-bl3.png&quot; style=&quot;border: 0px solid currentcolor; width: 249px; height: 54px;&quot; /&gt;&lt;/a&gt;&lt;/p&gt;&#10;</description>
   <link>http://www.fdotmiamidade.com/current-projects/expressways/95-express.html</link>
   <title>95 Express</title>
   <dc:date>2008-02-01</dc:date>
   <guid>71</guid>
  </item>
  <item>
   <description>&lt;p&gt;&#10;&#9;The Florida Department of Transportation (&lt;span data-scayt_word=&quot;FDOT&quot; data-scaytid=&quot;1&quot;&gt;FDOT&lt;/span&gt;) District Six (Miami-Dade County) and &lt;span data-scayt_word=&quot;FDOT&quot; data-scaytid=&quot;2&quot;&gt;FDOT&lt;/span&gt; District Four (Broward County) are working together to implement express lanes along 28 miles of the SR 826/Palmetto Expressway and I-75 corridors from just south of SR 836/Dolphin Expressway in Miami-Dade County to I-595 in Broward County.&lt;/p&gt;&#10;&lt;p&gt;&#10;&#9;In a collaborative effort, both Districts will jointly manage the procurement, design, and construction of the following six project segments:&lt;/p&gt;&#10;&lt;p&gt;&#10;&#9;&amp;bull;&amp;nbsp;&amp;nbsp; &lt;span data-scayt_word=&quot;FDOT&quot; data-scaytid=&quot;3&quot;&gt;FDOT&lt;/span&gt; District Six is implementing the I-75/Palmetto Express Lanes Project (Palmetto Express) in Miami-Dade County which extends&amp;nbsp;&amp;nbsp; approximately 10 miles along the Palmetto Expressway from West Flagler Street to NW 154 Street, and approximately three (3) miles along I-75 from the Palmetto Expressway to NW 170 Street. For additional information on the I-75/Palmetto Express project in Miami-Dade County, please contact Marta.Rodriguez@dot.state.fl.us&lt;/p&gt;&#10;&lt;p&gt;&#10;&#9;&amp;bull;&amp;nbsp; &lt;span data-scayt_word=&quot;FDOT&quot; data-scaytid=&quot;5&quot;&gt;FDOT&lt;/span&gt; District Four will be responsible for the five (5) project segments from I-595 south to NW 170 Street (15 miles). For additional information about the 75 Express project, from I-595 to NW 170 Street, please visit www.75-express.com.&lt;/p&gt;&#10;&lt;p style=&quot;text-align: center&quot;&gt;&#10;&#9;To visit the full website dedicated to this project, click on the logo below or log on to www.palmettoexpresslanes.com.&lt;/p&gt;&#10;&lt;p style=&quot;text-align: center&quot;&gt;&#10;&#9;&lt;a href=&quot;http://palmettoexpresslanes.com&quot;&gt;&lt;img alt=&quot;&quot; src=&quot;/userfiles/images/pel_logo_header.jpg&quot; style=&quot;width: 505px; height: 100px&quot; /&gt;&lt;/a&gt;&lt;/p&gt;&#10;</description>
   <link>http://www.fdotmiamidade.com/current-projects/expressways/sr-826palmetto-express-lanes.html</link>
   <title>SR 826/Palmetto Express Lanes</title>
   <dc:date>2014-01-01</dc:date>
   <guid>235</guid>
  </item>
  <item>
   <description>&lt;p&gt;&#10;&#9;&lt;span style=&quot;font-size: 12px&quot;&gt;On Monday, January 9, the Florida Department of Transportation (&lt;span class=&quot;scayt-misspell&quot; data-scayt_word=&quot;FDOT&quot; data-scaytid=&quot;1&quot;&gt;FDOT&lt;/span&gt;) will start a roadway project&amp;nbsp;at NW 87 Avenue (W 28&amp;nbsp;Avenue)&amp;nbsp;on State Road (SR) 93/I-75 to NW 103 Street along southbound SR 826/Palmetto&amp;nbsp;Expressway. This project will last about 420 days&amp;nbsp;and cost an estimated $6.7 million.&lt;/span&gt;&lt;/p&gt;&#10;&lt;p&gt;&#10;&#9;&lt;span style=&quot;font-size: 12px&quot;&gt;This Project Includes:&lt;/span&gt;&lt;/p&gt;&#10;&lt;ul&gt;&#10;&#9;&lt;li&gt;&#10;&#9;&#9;&lt;span style=&quot;font-size: 12px&quot;&gt;Adding an&amp;nbsp;extra lane on the eastbound SR&amp;nbsp;93/I-75 exit ramp&lt;/span&gt;&lt;/li&gt;&#10;&#9;&lt;li&gt;&#10;&#9;&#9;&lt;span style=&quot;font-size: 12px&quot;&gt;Adding an extra lane on southbound SR&amp;nbsp;826 between the exit ramp on SR 93/I-75&amp;nbsp;and NW 103 Street&lt;/span&gt;&lt;/li&gt;&#10;&#9;&lt;li&gt;&#10;&#9;&#9;&lt;span style=&quot;font-size: 12px&quot;&gt;&lt;span class=&quot;scayt-misspell&quot; data-scayt_word=&quot;Repaving&quot; data-scaytid=&quot;3&quot;&gt;Repaving&lt;/span&gt; the exit ramps&lt;/span&gt;&lt;/li&gt;&#10;&#9;&lt;li&gt;&#10;&#9;&#9;&lt;span style=&quot;font-size: 12px&quot;&gt;Installing new signage&lt;/span&gt;&lt;/li&gt;&#10;&#9;&lt;li&gt;&#10;&#9;&#9;&lt;span style=&quot;font-size: 12px&quot;&gt;Upgrading drainage system and lighting&lt;/span&gt;&lt;/li&gt;&#10;&#9;&lt;li&gt;&#10;&#9;&#9;&lt;span style=&quot;font-size: 12px&quot;&gt;Minor landscaping changes&lt;/span&gt;&lt;/li&gt;&#10;&lt;/ul&gt;&#10;</description>
   <link>http://www.fdotmiamidade.com/current-projects/expressways/sr-826palmetto-expwy-from-i-75-to-nw-103-st.html</link>
   <title>SR 826/Palmetto Expwy from I-75 to NW 103 St</title>
   <dc:date>2012-01-09</dc:date>
   <guid>159</guid>
  </item>
  <item>
   <description>&lt;p&gt;&#10;&#9;This project includes replacing sections of sidewalk; curb and gutter, and pedestrian ramps; partially rebuilding a small section of roadway; leveling several driveways to match the roadway; installing trench drains and several underground drainage structures; updating &lt;span data-scayt_word=&quot;signalization&quot; data-scaytid=&quot;1&quot;&gt;signalization&lt;/span&gt;; adding a bicycle lane; &lt;span data-scayt_word=&quot;repaving&quot; data-scaytid=&quot;2&quot;&gt;repaving&lt;/span&gt; and &lt;span data-scayt_word=&quot;restriping&quot; data-scaytid=&quot;3&quot;&gt;restriping&lt;/span&gt; the roadway; placing decorative pavement at crosswalks; updating signage and pavement markings; and eliminating nine parking spaces between 75 Street and 69 Street.&lt;/p&gt;&#10;</description>
   <link>http://www.fdotmiamidade.com/current-projects/expressways/sr-a1aharding-ave-from-indian-creek-dr-to-south-of-75-st.html</link>
   <title>SR A1A/Harding Ave from Indian Creek Dr to south of 75 St</title>
   <dc:date>2012-04-09</dc:date>
   <guid>172</guid>
  </item>
  <item>
   <description>&lt;p&gt;&#10;&#9;This project includes adding an extra lane on westbound SR 826 between the exit ramps on NW 67 Avenue and NW 47 Avenue; adding a second lane at the westbound off-ramps at NW 67 Avenue and NW 57 Avenue; &lt;span class=&quot;scayt-misspell&quot; data-scayt_word=&quot;repaving&quot; data-scaytid=&quot;1&quot;&gt;repaving&lt;/span&gt; the exit ramps and frontage roads; installing a new electronic message sign board; upgrading drainage system and upgrading lighting and signage.&lt;/p&gt;&#10;</description>
   <link>http://www.fdotmiamidade.com/current-projects/expressways/sr-826palmetto-expwy-from-nw-67-ave-to-nw-47-ave.html</link>
   <title>SR 826/Palmetto Expwy from NW 67 Ave to NW 47 Ave</title>
   <dc:date>2011-09-12</dc:date>
   <guid>134</guid>
  </item>
  <item>
   <description>&lt;p&gt;&#10;&#9;This project included widening&amp;nbsp;the medians on&amp;nbsp;Ives Dairy Road and&amp;nbsp;the entrance and exit ramps to/from&amp;nbsp;I-95 to&amp;nbsp;ease traffic&amp;nbsp;flow through this area.&amp;nbsp;All major work&amp;nbsp;is completed. Remaining minor items will be&amp;nbsp;done by&amp;nbsp; the end of May 2013.&lt;/p&gt;&#10;</description>
   <link>http://www.fdotmiamidade.com/current-projects/expressways/i-95ives-dairy-rd-interchange.html</link>
   <title>SR 9/I-95/Ives Dairy Rd Interchange</title>
   <dc:date>2012-02-01</dc:date>
   <guid>166</guid>
  </item>
  <item>
   <description>&lt;p&gt;&#10;&#9;This project will&amp;nbsp;extend the&amp;nbsp;existing express lanes north from Miami&amp;nbsp;Gardens Drive in&amp;nbsp;Miami-Dade County&amp;nbsp;to Broward&amp;nbsp;Boulevard in Broward County by converting&amp;nbsp;the&amp;nbsp;High Occupancy Vehicle (&lt;span class=&quot;scayt-misspell&quot; data-scayt_word=&quot;HOV&quot; data-scaytid=&quot;1&quot;&gt;HOV&lt;/span&gt;) lanes&amp;nbsp;to two express lanes&amp;nbsp;in each direction. Other work includes:&amp;nbsp;installing Intelligent Transportation System (ITS) components; bridge widening at specific locations and installing noise walls at specific locations between Hollywood Boulevard&amp;nbsp;and&amp;nbsp;Taft Street.&amp;nbsp;&lt;/p&gt;&#10;</description>
   <link>http://www.fdotmiamidade.com/current-projects/expressways/95-express-phase-2.html</link>
   <title>95 Express Phase 2</title>
   <dc:date>2011-11-28</dc:date>
   <guid>167</guid>
  </item>
  <item>
   <description>&lt;p&gt;&#10;&#9;Construction include widening several ramps throughout the Golden Glades Interchange to include a paved shoulder, installing several underground drainage structures, replacing sections of guardrail, replacing a section of communications system along SR 826, &lt;span class=&quot;scayt-misspell&quot; data-scayt_word=&quot;repaving&quot; data-scaytid=&quot;1&quot;&gt;r&lt;span class=&quot;scayt-misspell&quot; data-scayt_word=&quot;epaving&quot; data-scaytid=&quot;12&quot;&gt;epaving&lt;/span&gt;&lt;/span&gt; and restriping several ramps throughout Golden Glades Interchange, and updating signage and pavement markings.&lt;br /&gt;&#10;&#9;&amp;nbsp;&lt;/p&gt;&#10;</description>
   <link>http://www.fdotmiamidade.com/current-projects/expressways/sr-826-sr-7-sr-9-and-sr-9a-ramps-within-the-golden-glades-interchange-1.html</link>
   <title>SR 826, SR 7, SR 9 and SR 9A ramps within the Golden Glades Interchange</title>
   <dc:date>2012-09-24</dc:date>
   <guid>196</guid>
  </item>
  <item>
   <description>&lt;p&gt;&#10;&#9;This project consists of adding bicycle lanes along the William Lehman Causeway; &lt;span class=&quot;scayt-misspell&quot; data-scayt_word=&quot;repaving&quot; data-scaytid=&quot;1&quot;&gt;repaving&lt;/span&gt; and &lt;span class=&quot;scayt-misspell&quot; data-scayt_word=&quot;restriping&quot; data-scaytid=&quot;3&quot;&gt;restriping&lt;/span&gt; the roadway.&lt;/p&gt;&#10;&lt;p&gt;&#10;&#9;&amp;nbsp;&lt;/p&gt;&#10;&lt;p&gt;&#10;&#9;Traffic lanes may be closed at times for safety reasons. Lane closures will occur from:&lt;br /&gt;&#10;&#9;9:00 a.m. to&amp;nbsp; 3:30 p.m. Weekdays and weekends&lt;br /&gt;&#10;&#9;9:00 p.m. to 5:30 a.m. Sunday through Thursday nights&lt;br /&gt;&#10;&#9;11:00 p.m. to 7:00 a.m. Friday and Saturday nights&lt;br /&gt;&#10;&#9;&amp;nbsp;&lt;/p&gt;&#10;</description>
   <link>http://www.fdotmiamidade.com/current-projects/expressways/sr-856william-lehman-cswy-from-w-country-club-dr-to-collins-ave--1.html</link>
   <title>SR 856/William Lehman Cswy from W Country Club Dr to Collins Ave </title>
   <dc:date>2013-01-07</dc:date>
   <guid>216</guid>
  </item>
  <item>
   <description>&lt;p&gt;&#10;&#9;This project consists of adding bicycle lanes along the eastbound and westbound shoulders of the SR 112/Julia Tuttle Causeway; &lt;span class=&quot;scayt-misspell&quot; data-scayt_word=&quot;restriping&quot; data-scaytid=&quot;1&quot;&gt;restriping&lt;/span&gt; the shoulders as a bicycle path; and installing new signage.&lt;/p&gt;&#10;&lt;p&gt;&#10;&#9;Traffic lanes may be closed at times for safety reasons. Lane closures will occur from:&lt;br /&gt;&#10;&#9;9:00 a.m. to&amp;nbsp; 3:30 p.m. Weekdays and weekends&lt;br /&gt;&#10;&#9;9:00 p.m. to 5:30 a.m. Sunday through Thursday nights&lt;br /&gt;&#10;&#9;11:00 p.m. to 7:00 a.m. Friday and Saturday nights&lt;br /&gt;&#10;&#9;&amp;nbsp;&lt;/p&gt;&#10;</description>
   <link>http://www.fdotmiamidade.com/current-projects/expressways/sr-112julia-tuttle-cswy-from-biscayne-blvd-to-alton-rd--1.html</link>
   <title>SR 112/Julia Tuttle Cswy from Biscayne Blvd to Alton Rd </title>
   <dc:date>2013-01-22</dc:date>
   <guid>217</guid>
  </item>
  <item>
   <description>&lt;p&gt;&#10;&#9;This project consists of &lt;span class=&quot;scayt-misspell&quot; data-scayt_word=&quot;repaving&quot; data-scaytid=&quot;1&quot;&gt;repaving&lt;/span&gt; and &lt;span class=&quot;scayt-misspell&quot; data-scayt_word=&quot;restriping&quot; data-scaytid=&quot;3&quot;&gt;restriping&lt;/span&gt; the ramps on I-75.&lt;/p&gt;&#10;</description>
   <link>http://www.fdotmiamidade.com/current-projects/expressways/sr860-miami-gardens-drive-from-i-75-to-nw-87-ave--1.html</link>
   <title>SR/860 Miami Gardens Drive from I-75 to NW 87 Ave </title>
   <dc:date>2013-01-28</dc:date>
   <guid>218</guid>
  </item>
 </channel>
</rss>