The Florida Department of Transportation (FDOT) will be developing design plans for a roadway widening and reconstruction project along SW 312 Street/Campbell Drive from SR 997/Krome Avenue to SR 5/US 1, and along SW 312 Street/Campbell Drive, SW 336 Street/Davis Parkway and SR 9336/Palm Drive from Krome Avenue to US 1, in Miami-Dade County.

Project: SW 312 Street/Campbell Drive from SR 997/Krome Avenue to SR 5/US 1

WORK TO BE PERFORMED:

  • Widening of Campbell Drive from West of Krome Avenue to East of US 1
  • Reconstructing the roadway from Krome Avenue to US 1
  • Providing two 11-foot thru lanes in each direction
  • Upgrading signage pavement markings to current standards
  • Improving existing traffic and pedestrian signals to current standards
  • Installing new drainage and lighting

Project: SW 336 Street/Davis Parkway from SR 997/Krome Avenue to SR 5/US 1

WORK TO BE PERFORMED:

  • Reconstructing Davis Parkway to extend the capacity of existing pavement to facilitate truck bypass
  • Adding right turn lanes at the intersections of Davis Parkway and Krome Avenue and Davis Parkway and US 1
  • Improving drainage throughout the project limits
  • Adding sidewalk on Davis Parkway
  • Repaving and restriping the roadway
  • Installing curb ramps
  • Upgrading lighting, signalization, signing and pavement markings, crosswalks
     

Project: SR 9336/Palm Drive/SW 344 Street from SR 997/Krome Avenue to SR 5/US 1

WORK TO BE PERFORMED:

  • Adding right turn lanes southbound to westbound at the intersections of Krome Avenue and US 1
  • Repaving and restriping the roadway
  • Upgrading lighting, signalization, signing and pavement markings
  • Improving drainage along Krome Avenue

 MAINTENANCE OF TRAFFIC (MOT):

Temporary lane closures during non-peak hours will have minimal effects on traffic. 

Project At-A-Glance
 
map
Start Date
September 2019

Est. Completion date
April 2021

Construction Cost
$14.3 million

Lengths and Limits
Along SR 997/Krome Avenue from SW 312 to SW 296

Project Manager
Fabiana Gonzalez, P.E.


FDOT Project Manager
Nathaniel Pulido, P.E.


Project Engineer
Frank Panellas, P.E.

TRACE Consultants, Inc.


Consultant Design Project Manager
Juan S. Calderon, P.E.

Caltran Engineering Group, Inc.


Consultant Design Project Manager
Shahin Shafiq, P.E.

HSQ Group, Inc.