Sunny Isles Boulevard (SR 826) Control House & Bridge Rehabilitation Project

FIN No. 250065-2-52-01

WPI No. N/A

 

Project Limits

Sunny Isles Boulevard Bascule Bridge over the Intracoastal Waterway.

 

Project Summary

Work includes structurally reinforcing the existing control house and refurbishing the lightning protection system, new windows, a closed circuit television system, and repairing the existing fender system.

 

Start Date: September 2008

 

Completion: Spring 2009

 

Construction Cost: $788, 000

 

Project Team:

FDOT North Miami-Dade Resident Engineer
Ivan Hay, P.E.

 

Construction Engineering & Inspection
Bolton, Perez & Associates, Inc.

 

Contractor
PCL Civil Constructors, Inc.

 

Public Information
Monica Diaz
305.499.2410
Monica.Diaz@dot.state.fl.us